1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 9.00 LPA
A Manager Production Planning Control (PPC) for a fabrication plant develops, implements, and monitors detailed production schedules to optimize resources, minimize downtime, and ensure timely delivery of fabricated products. They coordinate with procurement, engineering, and shop floor teams, managing raw material inventory and aligning production with customer demand.
Key Responsibilities
Production Scheduling: Create and maintain ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.16 LPA TO 3.00 LPA
A Production Engineer Planning for a Fabrication Plant develops, schedules, and manages manufacturing operations to optimize productivity, cost-efficiency, and on-time delivery. Key responsibilities include creating production schedules, managing inventory, optimizing resource utilization, implementing quality control, and reducing bottlenecks in fabrication workflows.
Key Responsibilities and Duties:
Production Planning & Scheduling: Create detailed production schedules, work orders, ...