1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
A Planning Executive in a tower manufacturing company (such as telecom or transmission towers) bridges sales orders, material availability, and shop floor production. They develop master production schedules, coordinate raw material procurement, and track project timelines to ensure on-time delivery while minimizing downtime and maximizing facility capacity. [1, 2]
Core Responsibilities
Production ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
A Planning Coordinator in a tower manufacturing company (e.g., transmission towers, telecom towers) acts as the bridge between sales orders, material availability, and shop floor production. They create, monitor, and adjust production schedules to ensure towers are fabricated, galvanized, and delivered on time, minimizing downtime and maximizing capacity.
Key Responsibilities
Production Planning & ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.20 LPA TO 4.80 LPA
A Planning Engineer is the project's mastermind who designs schedules, forecasts resource needs, and monitors progress. They ensure complex projects (like construction, oil & gas, or infrastructure) finish on time and within budget by spotting roadblocks before they cause costly delays.
Here is a comprehensive and structured job description template you ...
- Planning Engineer
- Production Planning Engineer
- Ppc Engineer
- Production Planning & Control Engineer
- Planning Executive
- Planning Officer
- Manufacturing Planning Engineer
- Industrial Engineer
- Production Engineer
- Operations Planning Engineer
- Production Planning
- Production Scheduling
- Capacity Planning
- Material Planning
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.60 LPA TO 4.20 LPA
A Planning Head directs the strategic, operational, and resource planning of a business or major project to meet organizational goals on time and within budget. This senior leader oversees scheduling, mitigates risks, manages large-scale budgets, and coordinates cross-functional teams to drive efficiency and sustainable growth.
Core Responsibilities
Strategic Planning: Formulate, develop, and ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 9.00 LPA
A Manager Production Planning Control (PPC) for a fabrication plant develops, implements, and monitors detailed production schedules to optimize resources, minimize downtime, and ensure timely delivery of fabricated products. They coordinate with procurement, engineering, and shop floor teams, managing raw material inventory and aligning production with customer demand.
Key Responsibilities
Production Scheduling: Create and maintain ...
2 Opening(s)
7.0 Year(s) To 10.0 Year(s)
4.20 LPA TO 6.00 LPA
A Manager of Production & Planning in a chains manufacturing company orchestrates daily manufacturing, develops production schedules based on demand, manages raw material inventory, and ensures safety and quality standards are met. This role optimizes resource utilization to meet delivery targets, reduces manufacturing costs, and leads production teams.
Key Responsibilities
Production Scheduling: Create and ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.16 LPA TO 3.00 LPA
A Production Engineer Planning for a Fabrication Plant develops, schedules, and manages manufacturing operations to optimize productivity, cost-efficiency, and on-time delivery. Key responsibilities include creating production schedules, managing inventory, optimizing resource utilization, implementing quality control, and reducing bottlenecks in fabrication workflows.
Key Responsibilities and Duties:
Production Planning & Scheduling: Create detailed production schedules, work orders, ...
1 Opening(s)
0 To 0.1 Year(s)
1.20 LPA TO 1.44 LPA
A Planner Operator manages daily production, maintenance, or logistics workflows by coordinating resources, allocating personnel, and tracking performance. They act as the bridge between management and floor-level operations to minimize downtime, maximize efficiency, and ensure all tasks are completed on schedule and within budget.
Key Responsibilities
Workflow Optimization: Plan, organize, and prioritize ...
- Planner Operator
- Planning Operator
- Production Planner
- Production Planning Operator
- Ppc Operator
- Planning Executive
- Production Planning Executive
- Machine Planner
- Manufacturing Planner
- Operations Planner
- Production Planning
- Production Scheduling
- Capacity Planning
- Material Planning
- Resource Planning
- Inventory Planning
- Production Control
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.40 LPA TO 6.00 LPA
A Production Head oversees the entire manufacturing and production lifecycle, aligning plant operations with strategic business goals. They drive efficiency, optimize workflows, manage plant budgets, and ensure outputs consistently meet safety and quality benchmarks.
Role Overview
The Production Head (or Head of Production) is responsible for the overall strategic and operational leadership ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 4.20 LPA
A Deputy Manager, IT Systems & Networks is responsible for managing and maintaining an organization's network infrastructure, including servers, routers, switches, and firewalls. Key duties include configuring network devices, performing system upgrades and maintenance, monitoring performance, ensuring security, and providing Level 2/3 technical support. The role also involves strategic planning, capacity ...