1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.20 LPA
A Production Planning Engineer manages manufacturing workflows, creates optimized production schedules, and balances machine and labor capacity to ensure on-time product delivery within budget. They act as the core link between sales forecasts, procurement, and the shop floor.
Key Responsibilities
Scheduling: Build daily, weekly, and monthly production plans based on customer orders ...
- Production Planning Engineer
- Production Planning Executive
- Production Planner
- Ppc Engineer
- Ppc Executive
- Planning Engineer
- Production Control Engineer
- Manufacturing Planning Engineer
- Industrial Engineer
- Production Engineer
- Operations Planning Engineer
- Production Planning & Control
- Ppc
- Production Scheduling
- Capacity Planning