2 Opening(s)
10.0 Year(s) To 15.0 Year(s)
3.60 LPA TO 7.20 LPA
Planning of material flow for timely execution of jobs.
ontinuous improvement in process & overall department performance.
Monitor the production and Quality as per customer requirement;
Ensure that health and safety guidelines are followed;
Planning for Environment Aspect & risk.
Cost control measures.
Employee involvement in performance improvement.
Co-ordination with all service department / division.
Supervise and motivate ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 20.00 LPA
Urgent requirement PLANT HEAD - DRI at Raipur
PLANT HEAD - DRI plant ,Responsible for maintenance and upkeep of all process equipments,Training & development l Engineers and Staff,Responsible for performance and cost control of operation of the plant,
Commissioning of DRI kiln with refractory line heating & plant equipment.
Planning & scheduling of ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 18.00 LPA
Urgent requirement HEAD - PRODUCTION for Sponge Iron Division at Raipur
is a senior role within a manufacturing or production environment responsible for overseeing the entire production process, ensuring that products are manufactured on time, within budget, and to the required quality standards, while managing the production team and optimizing efficiency across ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
5.00 LPA TO 6.00 LPA
Description:
Urgent requirement for Manager mechanical maintenance sponge iron dri for reputed steel plant at Bilaspur CG location.
Handling mechanical activities in running maintenance, shutdown maintenance, preventive
maintenance and breakdown maintenance.
Monitoring the root cause of problems arising during routine maintenance work and implementing
systematic solution.
Preparation of preventive maintenance schedule & checklist.
Planning & controlling of ...
10 Opening(s)
2.0 Year(s) To 15.0 Year(s)
2.00 LPA TO 10.00 LPA
Urgent requirement AGM / DGM - PROCESS for Sponge Iron Division at Raipur
AGM / DGM - PROCESS for Sponge Iron Division of SID plant ,Responsible for maintenance and upkeep of all process equipments,Training & development l Engineers and Staff,Responsible for performance and cost control of operation of the plant,
Commissioning of ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
6.00 LPA TO 8.00 LPA
Urgent requirement production manager (Metallugy) for Sponge Iron Division 100TPD*2 300TPD at RAIPUR
manager of Opration Department of SID plant ,Responsible for maintenance and upkeep of all process equipments,Training & development l Engineers and Staff,Responsible for performance and cost control of operation of the plant,
Commissioning of DRI kiln with refractory line heating ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.00 LPA TO 6.00 LPA
Urgent requirement production manager (Metallugy) for Sponge Iron Division 100TPD*2 350*TPD2 at RAIPUR
manager of Opration Department of SID plant ,Responsible for maintenance and upkeep of all process equipments,Training & development l Engineers and Staff,Responsible for performance and cost control of operation of the plant,
Commissioning of DRI kiln with refractory line heating ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.00 LPA TO 6.00 LPA
Urgent requirement production manager (Metallugy) for Sponge Iron Division at Raipur
manager of Opration Department of SID plant ,Responsible for maintenance and upkeep of all process equipments,Training & development l Engineers and Staff,Responsible for performance and cost control of operation of the plant,
Commissioning of DRI kiln with refractory line heating & ...
1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 25.00 LPA
Urgent requirement manager/SR MANAGER (Metallugy) for Sponge Iron Division ( 100*8TPD at JHARSUGUDA)
Incharge of Opration & MAINTENANCE Department of SID plant ,
Annual Production & Raw material planning as per Management.
Ensure that the production is cost effective;
Quality compliance. / Environment & OHS Compliance.
Inventory control through Controlling Sp. Consumption.
Continuous improvement in process & ...
1 Opening(s)
20.0 Year(s) To 30.0 Year(s)
30.00 LPA TO 45.00 LPA
Urgent requirement PLANT HEAD - DRI at raigarh
PLANT HEAD - DRI plant ,Responsible for maintenance and upkeep of all process equipments,Training & development l Engineers and Staff,Responsible for performance and cost control of operation of the plant,
Commissioning of DRI kiln with refractory line heating & plant equipment.
Planning & scheduling of ...