1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.40 LPA
esponsibilities:
Maintenance and Repair:
Perform routine maintenance tasks on mechanical equipment such as rotary kilns, crushers, conveyors, and other machinery used in the sponge iron production process.
Conduct inspections, diagnose mechanical problems, and carry out repairs or replacements of faulty components to minimize downtime and ensure equipment reliability.
Installation and Commissioning:
Assist in the installation, ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 8.00 LPA
Here is a typical job description for a Ass. Manager/Deputy Manager - Mechanical (CCP):
Job Title: Manager/Deputy Manager - Mechanical (CCP)
Job Summary:
We are seeking an experienced and skilled Manager/Deputy Manager - Mechanical (CCP) to lead our mechanical maintenance team in ensuring optimal performance, reliability, and efficiency of our cement plant's mechanical ...
3 Opening(s)
5.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.00 LPA
POST NAME – COAL WASHERY OPERATOR
NUMBER OF POST – 03
QUALIFICATION- ITI , DIPLOMA ,B.SC
Key Responsibilities:
Operate and monitor coal washing equipment, including crushers, screens, separators, and conveyors, ensuring smooth operation and minimal downtime.
Ensure that the washing process adheres to quality standards and specifications by adjusting machine settings and controls ...
5 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
Responsibilities
Setup and Material Management
Ensure crusher is level at all times
Maintain site cleanliness, and perform general labour activities, including but not limited to shoveling in and around the belts and crusher
Checks stockpile to ensure product quality and mix material to desired consistency
Prep material with a pulverizer or hammer as needed
Start-Up in ...