1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.80 LPA TO 7.00 LPA
Urgent requirement Mechanical Manager for Coal Washery Division at Bilaspur.
Incharge of Mechanical Department of Coal Washery ,Responsible for maintenance and upkeep of all process equipments,Training & development of Mechanical Engineers and Staff,Responsible for performance and cost control of mechanical Maintenance of the plant,Review design of Mechanical Systems Like HVAC, Plumbing and Fire Fighting systems from conceptual stage to completion ...
2 Opening(s)
8.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 7.00 LPA
e are currently looking for GENERAL MANAGER - DESIGN & DEVELOPMENT location
Mechanical engineer with nearly 15 years rich experience in the areas of New Product Development, R&D, Process Engineering & Improvement, Proto part Development and Service issue solution in Heavy Machinery & STRUCTURAL CNC MACHINE components Proficient in designing & developing new ...
2 Opening(s)
10.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 10.00 LPA
e are currently looking for GENERAL MANAGER - DESIGN & DEVELOPMENT location
Mechanical engineer with nearly 15 years rich experience in the areas of New Product Development, R&D, Process Engineering & Improvement, Proto part Development and Service issue solution in Heavy Machinery & STRUCTURAL CNC MACHINE components Proficient in designing & developing new ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
4.20 LPA TO 6.00 LPA
Role of a Quantity Surveyor (QS) at work
Before starting any construction project, the quantity surveyor analyzes the drawing and specifications of the new building that architects or engineers provide.
The surveyors calculate the quantity of the material used in the building. Also, they must calculate the actual work or labor cost.
Quantity ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 8.00 LPA
of managing all costs related to civil engineering and building projects from the first calculations to the final numbers. Quantity surveyors are tasked with reducing the overall cost of a project thus ensuring value for money.
responsibilities will vary depending on the type of project and its current stage, here are ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 8.00 LPA
of managing all costs related to civil engineering and building projects from the first calculations to the final numbers. Quantity surveyors are tasked with reducing the overall cost of a project thus ensuring value for money.
responsibilities will vary depending on the type of project and its current stage, here are ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 15.00 LPA
A Plant Head, also known as a Plant Manager or Factory Manager, is a senior leadership position responsible for overseeing the daily operations of a manufacturing plant. They ensure the plant meets production targets, maintains quality standards, and operates safely and efficiently.
Key Responsibilities:
Directing and Coordinating Operations:
Managing all aspects of the plant's activities, ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
15.00 LPA TO 20.00 LPA
Job Title: Plant Head (Aluminum Foil)
Job Summary:
We are seeking an experienced and dynamic Plant Head to oversee the overall operations of our aluminum foil manufacturing plant. The successful candidate will be responsible for leading the plant team to achieve production targets, improve efficiency, reduce costs, and ensure quality and safety ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 30.00 LPA
📌 Job Title: General Manager – Power Plant Operation & Maintenance
Location: Ramgarh Jharkhand Department: Power Plant / Utilities Reports To: Director / COO / Plant Head Experience: 20 –25 years (including minimum 5 years in a senior leadership role)
🔧 Key Responsibilities:
✅ Operations Management
Oversee the daily operation of the power plant ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
12.00 LPA TO 18.00 LPA
The Power Plant Head is responsible for leading and managing projects and operations from conception to completion.
POWER PLANT HEAD MUST BE HAVING EXPERIANCE IN THERMAL & BIOMASS POWER PLANT
Key job responsibilities include:
Project Planning: Develop project plans, timelines, and budgets.
Team Management: Lead a team of engineers, technicians, and contractors.
Design and Engineering: ...