1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.00 LPA
The Timmer Man (Refractory) is responsible for the lining, repair, and maintenance of the refractory lining in Induction Furnaces and Ladles within the Steel Melting Shop (SMS). They ensure the furnace lining is installed correctly, maintained during operation, and repaired quickly to prevent breakouts, maintaining operational efficiency.
Key Responsibilities
Furnace Lining Installation: Perform ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
A Melter in a Steel Melting Shop (SMS) is a highly skilled industrial role responsible for operating furnaces—typically Induction Furnaces or Electric Arc Furnaces (EAF)—to melt raw materials and refine them into high-quality molten steel.
Key Responsibilities
Furnace Operation: Operates and controls Induction Furnaces/EAF to melt scrap metal, sponge iron, and pig iron ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
An Engineer, Quality in a Steel Melt Shop (SMS) and Rolling Mill ensures product quality by monitoring production, ensuring adherence to standards, and leading improvement initiatives. This role involves collaborating with production and quality control teams to maintain rolling temperature, dimensional accuracy, and surface finish, and may also include documentation, troubleshooting, and implementing preventative measures for ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 18.00 LPA
Key requirements
A General Manager (GM) of a Steel Melting Shop (SMS) in a manufacturing plant is a senior-level position responsible for overseeing the entire steelmaking process, from raw material handling to the production of finished billets or ingots. This role ensures that production targets, quality standards, safety regulations, and cost-efficiency goals ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.80 LPA
The role of a Senior Engineer/Engineer for a Slag Crusher in a Steel Melt Shop (SMS) focuses on managing the operation, maintenance, and optimization of equipment used to process steelmaking slag into usable material. The position ensures efficient processing, safety compliance, and quality control.
Key Responsibilities
Operation Management: Oversee the daily operation of the slag ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 9.00 LPA
Urgent Requirement for production manager(sms) for reputed steel plant at raipur location.
Achieve Daily/Weekly/Monthly production target.Planning of different grades given by PPC Dept.Preparation of charge mix & melting of charge mix in furnaces.Special Grades making, process improvement & Quality improvement.
Cost reduction, planning of sequence casting & ingot casting.Ingot (pitside) raw material ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
24.00 LPA TO 30.00 LPA
Urgent Requirement of SMS Head (mechanical, electrical maintenance, operations) Induction/ Arc Furnace at Raigarh Location. 20 years of experience in steel melting in Induction furnace & 15 years as departmental head. Experience in Alloy Steel production preferably high carbon & high alloy contain steel. Preparation of Charge mix. Cost reduction ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.40 LPA
A Pump Operator (Mechanical) in a Steel Melting Shop (SMS) ensures continuous operation of critical hydraulic, cooling, and circulation systems. Responsibilities include operating/monitoring centrifugal/slurry pumps, performing preventive maintenance on seals and lubrication systems, and troubleshooting breakdowns to support steel production.
Key Responsibilities
Operational Monitoring: Start, stop, and monitor pump performance, including pressure, flow, and ...
3 Opening(s)
4.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.16 LPA
A CCM Fitter (SMS) in a Steel Melting Shop (SMS) is responsible for the fitting, assembly, and maintenance of mechanical components within the continuous casting machine (CCM) and other equipment in the steelmaking process. They work with various tools and machinery to fabricate, assemble, and repair parts, ensuring the smooth and efficient ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
15.00 LPA TO 25.00 LPA
Urgent Requirement for HEAD SMS INDUCTION FURNACE (EXPERIENCE 10tn, 12TN, 15TN, 20TN furnace) for Reputed Steel plant.
Achieve Daily/Weekly/Monthly production target.Planning of different grades given by PPC Dept.Preparation of charge mix & melting of charge mix in furnaces.Special Grades making, process improvement & Quality improvement.Cost reduction, planning of sequence casting & ...