1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
A Purchase Officer in a construction company manages the end-to-end procurement of materials (steel, cement, sand), equipment, and services, ensuring high-quality supplies arrive on time and within budget. They negotiate with vendors, manage purchase orders, analyze costs, and maintain inventory levels to support project timelines.
Key Responsibilities:
Procurement Strategy: Research, evaluate, and select reliable ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 7.20 LPA
A Purchase Manager for a Rolling Mill manages the end-to-end procurement of raw materials (billets/scrap), spares, mechanical/electrical components, and consumables. Key responsibilities include negotiating with suppliers, optimizing costs, maintaining inventory levels through ERP systems, and ensuring timely, quality deliveries. Candidates typically need 5+ years of relevant steel industry experience.
Key Responsibilities and ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
30.00 LPA TO 36.00 LPA
with experience in railway handling ( rakes, WIS, pvt siding etc)
A Logistics Head in a steel manufacturing company directs end-to-end supply chain operations, including raw material inbound (coal/iron ore) and finished steel (TMT/structurals) outbound logistics. Responsibilities include optimizing 3PL/fleet performance, managing ODC cargo, ensuring regulatory compliance, and driving cost-effective distribution using ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
4.20 LPA TO 6.00 LPA
Role of a Quantity Surveyor (QS) at work
Before starting any construction project, the quantity surveyor analyzes the drawing and specifications of the new building that architects or engineers provide.
The surveyors calculate the quantity of the material used in the building. Also, they must calculate the actual work or labor cost.
Quantity ...