1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 25.00 LPA
Company: Maa Kudargarhi Group
Department: Projects – Mechanical / DRI
Location: Tilda, Raipur, Chhattisgarh (Plant/Project Site)
Employment Type: Permanent / Full-Time
Project Execution & Lifecycle Management: Drive the complete mechanical project lifecycle for expansion or greenfield/brownfield setups.
Erection & Commissioning: Supervise structural alignment, mechanical erection, installation, and cold/hot commissioning of heavy plant machinery.
Cross-Functional Coordination: Work ...
- 1. Technical & Plant Equipment Keywords Core Processes: Dri (direct Reduced Iron)
- Sponge Iron
- Rotary Kiln (350 Tpd / Large Capacity)
- Steel Melting Shop (sms)
- Induction Furnace
- Ccm
- Ferro Alloy Plant
- Whrb / Cfbc Boiler
- Power Plant Auxiliaries. Heavy Equipment & Machinery: Kiln Drives & Gearboxes
- Rotary Coolers
- Material Handling Systems
- Conveyors
- Crushers & Screens
- Fume Extraction Systems (fes)
- Cooling Water Systems
- Pumps
- Compressors
- Cold Commissioning
- Trial Runs
- Plant Stabilization
- Punch-point Closure
- Structural Alignment
- Utility Piping
- Mechanical Design Review
- Root Cause Analysis (rca)
- Resource Deployment
- Milestone Tracking
- Cost Optimization
- Budgeting
- Site Safety (hse)
- Metallurgical Plant
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
6.00 LPA TO 12.00 LPA
Position Title: Plant Head / Factory Manager (Fabrication & Structural Steel)
Department: Operations / Plant Management
Location: Raipur, Chhattisgarh (or plant site)
Reporting To: Director / Chief Operating Officer (COO)
Plant Operations & Production Management:
Lead end-to-end heavy/structural fabrication operations (cutting, fitting, welding, assembly, surface treatment, and dispatch).
Formulate and execute daily, monthly, and annual Production ...
- ⚙️ Core Technical & Operational Keywords Heavy Fabrication & Structural Steel Fabrication Shop-floor Management & Plant Operations Production Planning & Control (ppc) Welding Technology (mig
- Tig
- Arc
- Saw) Quality Control & Assurance (ndt
- Asme
- Aws
- Is Standards) Plant Maintenance (preventive & Breakdown Maintenance
- Tpm) Resource Optimization & Capacity Utilization 👥 Leadership & Management Keywords Plant Head / Factory Manager / Operations Head P&l Management & Cost Reduction Manpower Management & Contract Labour Handling Supply Chain & Inventory Management Vendor Development & Raw Material Procurement Erp Systems (sap Mm/pp
- Health
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
22.00 LPA TO 32.00 LPA
Position Title: Civil Head / Head of Civil & Infrastructure
Company: Heavy Industrial Manufacturing & Steel Sector (e.g., Gauri Ganesh Ispat Pvt. Ltd., Raipur / Chhattisgarh Region)
Department: Projects & Civil Infrastructure
Reporting To: Director / Chief Operating Officer (COO) / Vice President - Projects
Project Planning & Execution: Direct the end-to-end execution of ...
- Project Management & Capex: Industrial Civil Construction | Plant Infrastructure Development | Capex Budgeting & Planning | End-to-end Project Execution | Site Management | Resource Optimization | Project Commissioning Industrial Engineering & Structures: Heavy Machinery Foundations | Rolling Mill & Furnace Foundations | Structural Steel Fabrication | Pre-engineered Buildings (peb) | Bar Bending Schedule (bbs) | Geotechnical & Soil Mechanics Review | Is Codes Compliance Design & Technical Tools: Staad.pro | Autocad | Sap2000 | Structural Analysis & Design | Bill Of Quantities (boq) | Topographical Surveying Contract
- Vendor
- & Cost Management: Contract Negotiation | Vendor Development & Management | Sub-contractor Management | Ra Bill Verification | Tendering & Estimation | Cost Control Quality Assurance & Safety (hse): Qa/qc Management | Construction Material Testing | Hse Site Standards | Safety Audits & Risk Assessment | Statutory Approvals | Building Bye-laws Compliance
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
20.00 LPA TO 32.00 LPA
Position Title: Civil Head / Head of Civil & Infrastructure
Company: Industrial Manufacturing / Steel & Metallurgical Sector (e.g., Pankaj Ispat, Raipur / Chhattisgarh Region)
Department: Projects & Civil Infrastructure
Reporting To: Director / Chief Operating Officer (COO) / Vice President - Projects
Project Management & Execution: Direct end-to-end execution of industrial civil works, ...
- Project Management & Capex: Industrial Civil Construction | Plant Infrastructure Development | Capex Budgeting & Planning | End-to-end Project Execution | Site Management | Resource Optimization | Project Commissioning Industrial Engineering & Structures: Heavy Machinery Foundations | Rolling Mill & Furnace Foundations | Structural Steel Fabrication | Pre-engineered Buildings (peb) | Bar Bending Schedule (bbs) | Soil Mechanics & Geotechnical Review | Is Codes Compliance Design & Technical Tools: Staad.pro | Autocad | Sap2000 | Structural Analysis & Design | Bill Of Quantities (boq) | Topographical Surveying Contract
- Vendor
- & Cost Management: Contract Negotiation | Vendor Development & Management | Sub-contractor Management | Ra Bill Verification | Tendering & Estimation | Cost Control Quality Assurance & Safety (hse): Qa/qc Management | Construction Material Testing | Hse Site Standards | Safety Audits & Risk Assessment | Statutory Approvals | Building Bye-laws Compliance
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.28 LPA TO 2.64 LPA
Safety Compliance & Audits: Regularly inspect plant machinery, shop floors, and operations to ensure compliance with factory safety acts, OSHA/local statutory rules, and company EHS guidelines.
Hazard Identification & Risk Assessment (HIZA): Identify potential workplace hazards, evaluate risks, and recommend preventive or corrective control measures.
Permit-to-Work System: Manage and monitor safety permits ...
- 1. Job Titles & Role Keywords Safety Officer Ehs Officer (environment
- Health & Safety) Hse Engineer Plant Safety Supervisor Safety Inspector Industrial Safety Specialist Fire & Safety Officer 2. Core Technical & Operational Skills Hazard Identification And Risk Assessment (hira) Job Safety Analysis (jsa) Permit-to-work (ptw) System Incident Investigation & Root Cause Analysis (rca) Safety Audits & Inspections Toolbox Talks & Safety Briefings Emergency Preparedness & Mock Drills Ppe (personal Protective Equipment) Management Occupational Health & Safety (ohs) 3. High-risk Operations & Safety Domains Hot Work Safety Working At Heights Confined Space Entry Electrical Safety Fire Fighting & Prevention Lifting & Rigging Safety Chemical / Material Handling Safety
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 14.00 LPA
Key Responsibilities
Manage the overall mechanical maintenance activities of the plant.
Plan and execute preventive, predictive, breakdown, and shutdown maintenance.
Ensure maximum availability and reliability of plant machinery and equipment.
Supervise maintenance of conveyors, gearboxes, pumps, compressors, crushers, fans, motors, and hydraulic systems.
Handle maintenance of DRI kilns, coolers, material handling systems, and other plant ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 4.20 LPA
Key Responsibilities
Maintain daily accounting transactions, including sales, purchases, receipts and payments.
Manage accounts payable, accounts receivable and vendor payments.
Maintain project-wise and site-wise accounts for real estate projects.
Handle GST returns, TDS calculations, deductions and timely filing.
Prepare bank reconciliation statements and maintain cash and bank records.
Maintain customer ledgers, booking receipts, payment schedules and ...
- Real Estate Accounting Tally Erp / Tally Prime Ms Excel Gst Returns And Reconciliation Tds Calculation And Filing Bank Reconciliation Accounts Payable & Receivable Project Costing Vendor Payments Customer Ledger Management Financial Reporting
- Balance Sheet And P&l Rera Accounting Knowledge Construction Billing Tax Compliance
4 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
Key Responsibilities
Supervise and manage shift-wise production activities in the Ferro Alloys Plant.
Monitor submerged arc furnace (SAF) operations and ensure smooth furnace performance.
Control furnace operating parameters, including temperature, voltage, current and power consumption.
Ensure proper raw material charging, melting and alloy production.
Achieve shift-wise production targets while maintaining product quality.
Allocate duties to furnace ...
- Shift Incharge
- Shift Incharge Engineer
- Shift Supervisor
- Shift Officer
- Shift Manager
- Shift Engineer
- Plant Shift Incharge
- Production Shift Incharge
- Maintenance Shift Incharge
- Mechanical Shift Incharge
- Electrical Shift Incharge
- Operations Shift Incharge
- Plant Operations Incharge
- Production Incharge
- Maintenance Incharge
- Plant Supervisor
- Operations Supervisor
4 Opening(s)
1.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
Job Title: CRO (Control Room Operator) – Ferro Alloys Industry: Ferro Alloys / Steel Plant / Manufacturing Department: Production / Operations Experience: 2–5 Years Qualification: Diploma / B.E. / B.Tech in Metallurgy, Mechanical, Electrical or Chemical Engineering (ITI candidates may be considered based on experience).
Key Responsibilities
Monitor and control furnace operations ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 6.00 LPA
Design and develop custom industrial dampers (Louver, Guillotine, Multi-louver, Diverter, and Butterfly dampers) for high-temperature flue gas and air-handling applications.
Perform sizing, torque calculations, and select appropriate actuators, drives, and sealing systems (metal-to-metal or flexible seals).
Prepare precise 2D and 3D models, assembly drawings, and manufacturing layouts using AutoCAD and SolidWorks / ...
- 1. Core Damper Design & Engineering Keywords Industrial Damper Design (louver
- Guillotine
- Diverter
- Butterfly Dampers) Flue Gas Desulfurization (fgd) System Dampers High-temperature & Pressure Ducting Design Damper Sizing
- Torque Calculation & Actuator Selection Sealing Systems (metal-to-metal & Flexible Seals) 2. Software & Technical Skills Keywords Autocad (2d & 3d Drafting) Solidworks / Catia / Inventor (3d Modeling & Assembly) Finite Element Analysis (fea) / Stress Analysis (ansys / Staad.pro) Bill Of Materials (bom) & Technical Data Sheets (tds) Preparation Engineering Calculations (aerodynamic & Structural Load Calculations) 3. Manufacturing & Plant Domain Keywords Heavy Steel Structural Fabrication & Welding Standards Material Selection (ss316l
- Alloy Steels
- Corten Steel For High Temp) Quality Inspection & Shop Floor Support As-built Drawings & Engineering Change Management (ecn) Compliance With Asme
- Astm
- And Bis Standards