1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.40 LPA TO 3.00 LPA
Working as Shift Incharge and handling my team for required preventive & breakdown of mechanical and hydraulic maintenance of all machines and parts of 20 stand 2 high continuous type rolling mill.
Maintenance and troubleshooting of hydraulic.
Pneumatic system maintenance.
Integrated Maintenance system (Preventive Maintenance, Breakdown Maintenance, Maintenance Control and Spares Management) for ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
Monitoring chemical parameters in the power station plant, Monitoring water treatment plant, effluent treatmentplant, chemistry, Performing Coal sampling and monitoring coal quality, Physical and chemical testing (e.g. Coal, Fuel, Waste-disposal), Testing and flue gas analysis, Testing of cooling water for corrosion and scaling tendency, Ensuring production of DM water for the units, Calibration of Lab ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 2.50 LPA
ITI Refrigeration (RAC)- 2 to 3 years experience in FMCG or Manufacturing ITI Fitter - 2 to 3 years experience in FMCG or Manufacturing Experience : ITI Fitter and ITI RAC candidates must have hands-on experience in operation and maintenance of Cooling systems like Cooling tower, Chilling Plant, Compressor, pump ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 3.00 LPA
Job description
Should be perfect in welding/ fitting/ alignment as welder/Fitter.Fitting for utility equipment like compressor, cooling tower, DG Set, Blower, Heat Exchanger, Material handling equipment.
Required Candidate profile
Candidate Should have at least 5 years of experience in fitter and have worked as foreman.
Job description
Should be perfect in welding/ fitting/ alignment as ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 30.00 LPA
📌 Job Title: General Manager – Power Plant Operation & Maintenance
Location: Ramgarh Jharkhand Department: Power Plant / Utilities Reports To: Director / COO / Plant Head Experience: 20 –25 years (including minimum 5 years in a senior leadership role)
🔧 Key Responsibilities:
✅ Operations Management
Oversee the daily operation of the power plant ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
18.00 LPA TO 24.00 LPA
mechanical maintenance of mill, &equipment's like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, pallet area, coil forming area. ,garret, funnel line, pinch roll, coiler, walking beam , accumulator, hydraulic unit, grease unit, lubrication unit, compressors, pumps, cooling tower, dg ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Description:
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 3.60 LPA
Ass. Engineer - block mill manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, pallet area, coil forming area. ,garret, funnel line, pinch roll, coiler, walking ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.60 LPA
Working in hydraulic department. Maintenance lubrication system gear box lubrication.
maintenance of mill, shift handling as shift incharg manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
9.00 LPA TO 10.00 LPA
Candidate should have min. 10-12 years of relevant post qualification experience of Power Based combined cycle co-generation
powerplant
& utility. He must have experience of Maintenance and trouble shooting in Gas Turbine , Process Steam Boiler/ Turbine & HRSG operation of 39MW and above capacity of each unit and, Cooling tower and auxiliaries.He ...