1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
PLC commissioning and troubleshooting in PLC
• Operation of fluid bed dryer system in Bio-plex plant
• Maintain Production line and equipment to high level of sanitation
• Responsible for reduce downtime and quality improvement of product and to
achieve monthly production target
• Knowledge of process parameter in plant ensure the safe and smooth ...