1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 25.00 LPA
commissioning of following Projects
Working as Project Lead steel melting shop,blast furnace,rolling mill,power plant,sponge iron,ferro alloys,
Monitoring/ tracking projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of the sameManaging overall operations for executing projects involving scoping, high level design & architecture, resource mobilization and execution within ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
9.00 LPA TO 9.60 LPA
A Mechanical Head of Department (HOD) is a senior leadership role responsible for overseeing mechanical operations, maintenance, or academic programs. The specific responsibilities depend entirely on whether the role is based in an industrial manufacturing plant or an engineering educational institution.
Option 1: Industrial / Manufacturing HOD
In heavy industries like steel, ...
1 Opening(s)
7.0 Year(s) To 10.0 Year(s)
3.60 LPA TO 4.20 LPA
A Head of Steel Melting Shop (SMS) oversees end-to-end production—furnaces (EAF/Induction), LRF, and casting (CCM)—to drive quality, yield, and cost efficiency.
Key Responsibilities
Production & Optimization: Manage operations to meet tonnage and specifications, reducing tap-to-tap time and optimizing charge-mix (sponge iron, scrap).
Quality & Safety: Maintain metallurgical standards (ISO) and strictly enforce environmental/safety ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 10.00 LPA
We Are Currently looking for Project Head for reputed Steel plant In SMS (20*4 TON FURNACE) at Chhattisgarh Location.
commissioning of following Projects
Working as Project Lead steel melting shop,,
Monitoring/ tracking projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of the sameManaging overall operations for executing ...
1 Opening(s)
18.0 Year(s) To 20.0 Year(s)
25.00 LPA TO 30.00 LPA
We Are Currently looking for Project Head for reputed Steel plant at Chhattisgarh Location.
commissioning of following Projects
Working as Project Lead steel melting shop,blast furnace,rolling mill,power plant,sponge iron,ferro alloys,
Monitoring/ tracking projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of the sameManaging overall operations for executing ...
2 Opening(s)
8.0 Year(s) To 10.0 Year(s)
2.50 LPA TO 3.00 LPA
rgent Requirement for Shift incharge steel melting shop LRF/induction furnace/EAF for Reputed Steel plant.
Planning people, Team management and Material requirement.Close monitoring and downtime analysis of day-to-day breakdown of m/c.Planning and scheduling of maintenance program on preventive basis.Executing capital repairs and modification as per the requirement.Safety, upkeep of machineries & care of ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 2.00 LPA
Urgent Requirement Lab Technician pipe division for reputed steel plant at Raipur location.
KNOWN THE ALL QUALITY EFFECT AND INSPECTION IN pipe Strong knowledge and understanding about all chemical and physical analysis of all mineral & metals.Responsible for all shift activities,Work experience in Wet chemical and instrumental analysis of Metal, Ores, ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 9.00 LPA
Urgent Requirement for dy manager/manager steel melting shop(induction furnace) for Reputed Steel plant.
Planning people, Team management and Material requirement.Close monitoring and downtime analysis of day-to-day breakdown of m/c.Planning and scheduling of maintenance program on preventive basis.Executing capital repairs and modification as per the requirement.Safety, upkeep of machineries & care of ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 25.00 LPA
Company: Maa Kudargarhi Group
Department: Projects – Mechanical / DRI
Location: Tilda, Raipur, Chhattisgarh (Plant/Project Site)
Employment Type: Permanent / Full-Time
Project Execution & Lifecycle Management: Drive the complete mechanical project lifecycle for expansion or greenfield/brownfield setups.
Erection & Commissioning: Supervise structural alignment, mechanical erection, installation, and cold/hot commissioning of heavy plant machinery.
Cross-Functional Coordination: Work ...
- 1. Technical & Plant Equipment Keywords Core Processes: Dri (direct Reduced Iron)
- Sponge Iron
- Rotary Kiln (350 Tpd / Large Capacity)
- Steel Melting Shop (sms)
- Induction Furnace
- Ccm
- Ferro Alloy Plant
- Whrb / Cfbc Boiler
- Power Plant Auxiliaries. Heavy Equipment & Machinery: Kiln Drives & Gearboxes
- Rotary Coolers
- Material Handling Systems
- Conveyors
- Crushers & Screens
- Fume Extraction Systems (fes)
- Cooling Water Systems
- Pumps
- Compressors
- Cold Commissioning
- Trial Runs
- Plant Stabilization
- Punch-point Closure
- Structural Alignment
- Utility Piping
- Mechanical Design Review
- Root Cause Analysis (rca)
- Resource Deployment
- Milestone Tracking
- Cost Optimization
- Budgeting
- Site Safety (hse)
- Metallurgical Plant
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.60 LPA
An Electrical Incharge (SMS) job description typically involves overseeing and managing the electrical operations within a Steel Melting Shop (SMS). This role includes tasks such as maintaining electrical equipment, troubleshooting issues, ensuring safety compliance, and coordinating with other departments.
Here's a more detailed look at the responsibilities and key areas of focus:
Key Responsibilities:
Maintenance ...