14 Job openings found

1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 12.00 LPA
BOE certificate Should be BOE CERTIFICATE  Operation and maintenance of  boiler.Monitoring and control on DM plant parameter.Operation of  turbine and auxiliary.Operation and maintenance of CHP and AHP.Costing of Power Generation.Planning for shut down and preventive maintenance.To provide all assistance for smooth operation. have experience of Steam turbine & Boiler operations  Experience of maintenance & ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 6.00 LPA
Description:     BOE certificate Should be BOE CERTIFICATE  Operation and maintenance of  boiler.Monitoring and control on DM plant parameter.Operation of  turbine and auxiliary.Operation and maintenance of CHP and AHP.Costing of Power Generation.Planning for shut down and preventive maintenance.To provide all assistance for smooth operation. have experience of Steam turbine & Boiler operations  Experience of maintenance & ...
2 Opening(s)
5.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 9.00 LPA
BOE CERTIFICATE    We are Currently Looking for Engineer/Manager(power plant) for Well reputed cement plant at Maharashtra location. Should be BOE CERTIFICATE  Operation and maintenance of  boiler.Monitoring and control on DM plant parameter.Operation of  turbine and auxiliary.Operation and maintenance of CHP and AHP.Costing of Power Generation.Planning for shut down and preventive maintenance.To provide all ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.40 LPA TO 6.00 LPA
Description:   BOE CERTIFICATE    We are Currently Looking for BOILER OPERATION ENGINEER (BOE)  for Well reputed cement plant at Satna (M.P) location. Should be BOE CERTIFICATE  Operation and maintenance of  boiler.Monitoring and control on DM plant parameter.Operation of  turbine and auxiliary.Operation and maintenance of CHP and AHP.Costing of Power Generation.Planning for shut down and preventive maintenance.To provide all ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.00 LPA
Boiler Engineer Job Duties Boiler engineers have a wide range of responsibilities, which can include: Ensuring that equipment is operating efficiently and safely by conducting tests and monitoring equipment performance Inspecting equipment for signs of damage or wear and making recommendations for repairs or replacement of parts Conducting research on new technologies related to ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
1.80 LPA TO 2.40 LPA
Boiler Engineer Job Duties Boiler engineers have a wide range of responsibilities, which can include: Ensuring that equipment is operating efficiently and safely by conducting tests and monitoring equipment performance Inspecting equipment for signs of damage or wear and making recommendations for repairs or replacement of parts Conducting research on new technologies related to ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
9.00 LPA TO 10.00 LPA
 Candidate should have min. 10-12 years of relevant post qualification experience of Power Based combined cycle co-generation  powerplant  & utility. He must have experience of Maintenance and trouble shooting in Gas Turbine , Process Steam Boiler/ Turbine & HRSG operation of 39MW and above capacity of each unit and, Cooling tower and auxiliaries.He ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 6.00 LPA
Description:     BOE certificate Should be BOE CERTIFICATE  Operation and maintenance of  boiler.Monitoring and control on DM plant parameter.Operation of  turbine and auxiliary.Operation and maintenance of CHP and AHP.Costing of Power Generation.Planning for shut down and preventive maintenance.To provide all assistance for smooth operation. have experience of Steam turbine & Boiler operations  Experience of maintenance & ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Monitoring the working of 12MW steam turbine. Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine. Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile