1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
3.00 LPA TO 3.60 LPA
Working in hydraulic department. Maintenance lubrication system gear box lubrication.
maintenance of mill, shift handling as shift incharg manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.50 LPA
Urgent Requirement of Engineer -Mechanical Maintenance for ferro alloys Divison at Rourkela Location.ferro alloysMaintenance Of Dryer, Vibrating Screen And Briquite Press. Maintenance Of Belt Pulley, DE System And Gearboxes. Scheduling Of Shutdown Jobs , Schduling Of Spare Parts & Handling Manpower.Position Sr.Engineer/Assistant Manager Mechanical Ferro AlloyERRO ALLOYS :-Maintenance Of Conveyor ...
5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.00 LPA
Walk in Interview for Shift Incharge mechanical maintenance for sponge iron for reputed integrated steel plant at Orissa Location.
Lead the total Mechanical maintenance team of TPD sponge iron plant for the maintenance of various equipments and machineries used in the plant which includes 100TPD Kiln, Cooler, screw compressors, lobe compressors, ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
Urgent Requirement oF ELECTRICAL & Instrument TECHNICIAN for Power Plant at Anuppur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress.
Duties include installing, inspecting, maintaining, operating, troubleshooting, repairing, and calibrating various ...