5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.60 LPA
A structural fitter works with blueprints and raw materials to assemble and fit together structural metal components for projects like buildings, bridges, and heavy machinery. Key responsibilities include cutting and shaping metal, laying out and marking parts, tack-welding assemblies, and ensuring all parts fit together according to specifications before permanent assembly by ...
4 Opening(s)
5.0 Year(s) To 7.0 Year(s)
4.20 LPA TO 4.80 LPA
A Senior Control & Automation Engineer for a power plant oversees the design, implementation, and maintenance of automation systems like SCADA, DCS, and PLC. Key responsibilities include leading technical teams, managing projects, ensuring system reliability and performance, developing and troubleshooting control logic, and collaborating with other departments to meet operational goals. ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 2.64 LPA
A Gas Cutter in a foundry plant uses oxy-fuel or similar equipment to cut and shape metal materials, including raw materials, structural components, and sometimes scrap, following safety protocols and technical drawings.
Job Description: Gas Cutter for Foundry Plant
Job SummaryThe Gas Cutter is responsible for the safe and efficient cutting, trimming, ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
12.00 LPA TO 15.00 LPA
AGM Machine Shop & CNC may refer to a number of companies that offer CNC machining services, including AGM Container Controls, AGM Automation Systems Inc., and AGM Maschinenbau.
AGM Container Controls
Offers CNC and CMM capabilities, as well as precision machining, rapid prototyping, and part marking
Has ISO9001/AS9100 certification, which allows them to work ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
6.60 LPA TO 7.80 LPA
Requirement for PRODUCTION MANAGER - for well reputed plant.at KOLKATA location.
Foundry Process and Inspection in phise plate casting production Checking gating & Method system, Pattern checking with help of drawing before moulding,Moulding sand selection & mould dimension checking and setting the core as per drawing. Pouring Temperature calculations and analysis.Sand quality checking, ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.00 LPA
1.bILLING,Estimation,drawing,layout,Understand the STP units. 2.Subcontractor billing cheque
3.Quantity survey and BOQ preparation. 4.Steel and cement reconciliation. 6.Knowing of marking of units as per layout.7.Handling of site supervisor with Jr. engineer 5 to 6 People Team.
Analysis and Design oF steel Structures for Material Handling Systems in plant and Industrial Structures
2 Hands on ...