3 Opening(s)
1.0 Year(s) To 3.0 Year(s)
0.96 LPA TO 1.44 LPA
On Site Work on various locations where our projects is going ,laying cable / wire etc connect fire control panel & its devices Hardworking,dedicated,Good Practical knowledge , tools knowledge,Analyse Techincal drawings able to travelReport generation 2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation of ...
1 Opening(s)
6.0 Year(s) To 8.0 Year(s)
1.20 LPA TO 1.53 LPA
Candidate should have ITI qualification and 5 year experience as Fitter in a large POWER PLANT.
5+ years of relevant experience in POWER PLANT as a mechanical Fitter Should be able to design tools and should be result oriented with time limit.o Minimum 5 to 7 years of Industry experience in placing ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
30.00 LPA TO 36.00 LPA
STEEL PLANT CONFIGURATION-SPONGE IRON 100*8,FURNACE - 20*4 TON,TMT -2 LAC TPA,POWER PLANT-70 MW,BLAST FURNACE-250 METER,FERROUS ALLOYS-15*2MVACALL FOR 0771 4268132/9009777337
The Details of present Services are as follows :
Over all responsible for production,maintenance,quality Control and planning of Pellet Plant ,sponge iron plant ,SMS,Power Plant and rolling mill as per targe
Over all responsible ...
1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
15.00 LPA TO 18.00 LPA
Urgent Requirement for GM/DGM Rolling Mill for Reputed Steel Plant.
To look after Daily Production & Maintenance.? Handling of Raw Material to Finish Product.? Daily/ Monthly production costing & analysing.? Work Planning as per requirement of production.? To communicate with Management for implementing at the workDesigning & implementing systems, procedures & ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.20 LPA TO 2.00 LPA
Urgent Requirement for Electrician for Reputed Steel plant at Raipur location
2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation of Utility machines in his shift. 4.Required ITI/NCVT passed Electrician with at least 4 to 6 years of experience with reputed factory/company. Candidate should have experience ...
1 Opening(s)
20.0 Year(s) To 30.0 Year(s)
50.00 LPA TO 60.00 LPA
An Electrical Head is a leadership role responsible for overseeing all aspects of an organization's electrical systems, including design, installation, maintenance, and safety. Key duties involve leading the electrical team, managing projects and budgets, ensuring compliance with industry standards, and providing technical guidance to junior staff. They are also responsible for implementing safety ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.60 LPA TO 6.00 LPA
We Currently Looking for Marine Engineer for Reputed Solvent industries at Raipur location.Position:-Marine Engineer Qualification: BE Marine Engineering Experience:-3 to 6 year
BE in marine Engineering with 5yr of operational experience in ship as shift incharge able to carry out overhaul,maintenance condition monitoring of machinery inventory control & spare part management Boiler operation ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.40 LPA
A process crane operator is responsible for safely and efficiently operating cranes to lift, move, and position materials and equipment within a specific process environment, such as a manufacturing plant or a construction site. This role requires a strong understanding of crane operations, safety procedures, and the ability to work collaboratively with ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.50 LPA TO 2.50 LPA
Urgent requirement of DCS Engineer for (Biomass Boiler) 10 MW Power Plant,
B.E/Diploma (Mech.) with 2 to 5 years experience as a DCS Engineer in (Biomass Boiler) a Power Plant in operation.
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control circuit, monitoring,DCS, PLC etc.To ...
5 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.16 LPA TO 2.40 LPA
A Control Room Operator (CRO) for a Ferro Alloys unit in a steel plant is responsible for monitoring and controlling submerged arc furnaces (SAF), raw material handling, and power parameters via DCS/SCADA systems to ensure efficient production. Key roles include managing furnace temperature, electrode positioning, and tapping schedules while adhering ...