1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
Urgent Requirement for Shift incharge steel melting shop(induction furnace) for Reputed Steel plant.
Planning people, Team management and Material requirement.Close monitoring and downtime analysis of day-to-day breakdown of m/c.Planning and scheduling of maintenance program on preventive basis.Executing capital repairs and modification as per the requirement.Safety, upkeep of machineries & care of quality ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
30.00 LPA TO 36.00 LPA
STEEL PLANT CONFIGURATION-SPONGE IRON 100*8,FURNACE - 20*4 TON,TMT -2 LAC TPA,POWER PLANT-70 MW,BLAST FURNACE-250 METER,FERROUS ALLOYS-15*2MVACALL FOR 0771 4268132/9009777337
The Details of present Services are as follows :
Over all responsible for production,maintenance,quality Control and planning of Pellet Plant ,sponge iron plant ,SMS,Power Plant and rolling mill as per targe
Over all responsible ...
1 Opening(s)
6.0 Year(s) To 11.0 Year(s)
4.00 LPA TO 4.80 LPA
Urgent requirement for LRF Engineer Operation for Reputed Steel Plant at Jharsuguda Location
Responsible for LRF Operation having : sound of secondary metallurgy,knowledge of dephosphorisation in ladle through induction furnace root awarness of safty requirements at inuduction furnace, manage the manpower of shift coordination with IF and CCm Ladle Refining Furnaces
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Ferroalloys in AOD Steelmaking:
Purpose:
Ferroalloys are used in AOD steelmaking to add specific alloying elements (like chromium, manganese, silicon, etc.) to the molten steel to achieve desired properties.
Types of Ferroalloys:
Common ferroalloys used in AOD include ferromanganese (FeMn), ferrochromium (FeCr), ferrosilicon (FeSi), and ferromolybdenum (FeMo).
Process:
AOD is a refining process that uses argon ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
18.00 LPA TO 24.00 LPA
mechanical maintenance of mill, &equipment's like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, pallet area, coil forming area. ,garret, funnel line, pinch roll, coiler, walking beam , accumulator, hydraulic unit, grease unit, lubrication unit, compressors, pumps, cooling tower, dg ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Description:
Urgent Requirement for Mechanical Maintenance SMS Induction Furnace for Reputed Steel Plant
1) Responsible for General Mechanical Maintenance, Break-down Maintenance and Lubrication of Machinery & Equipments.2) Responsible for periodical preventive maintenance schedules of all Machinery & Equipments and maintain their records from time to time.3) Responsible for preparation of material indents for ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 18.00 LPA
To administer timely task completion, manpower allocation and scheduled running of mechanical, preventive, operational & break down maintenance. To ensure assigned tasks are timely completed and recorded whenever required.
Responsible for timely fault finding, repair & maintenance of both auxiliary as well as furnace operations in ferro plant.
Ensure that mechanical costing ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
30.00 LPA TO 42.00 LPA
Job Summary :Briefly summarize your position's purpose or Role and its scope- Ensure cost effective and energy efficient production processes for different grade & quality of steelDuties And Responsibilities :Primary Duties & Responsibilities- Work in close coordination with PPC, Mills and Blast Furnace, Sinter Plant for preparing monthly operational Plan ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
36.00 LPA TO 48.00 LPA
Job Summary :Briefly summarize your position's purpose or Role and its scope- Ensure cost effective and energy efficient production processes for different grade & quality of steelDuties And Responsibilities :Primary Duties & Responsibilities- Work in close coordination with PPC, Mills and Blast Furnace, Sinter Plant for preparing monthly operational Plan ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Description:
1) Melts gold, or gold and silver alloys, using furnace, electric heating unit, or torch, and pours molten metal into ingot molds to prepare metal for use in making jewelry: Places metal in clay crucible.
2) Places crucible in preheated oven or heats crucible with torch to melt metal.
3) Observes ...