1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
10.00 LPA TO 15.00 LPA
Requirement GENERAL MANAGER-MECHANICAL MAINTENANCE SPONGE IRON(350*2TPD 100*2TPD) for new generation integrated steel and power manufacturing based in Raipur (chhattisgarh) & Odisha location India. SID-4 Kilns (2 * 350TPD and 100*2tpd)Power- 80 MW/56 MW. (AFBC & WHRB boiler) Induction furnace 12ton-20 Tone (10 Panel) 25 MWT MT TMT Bar mill Ferro Alloys ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.80 LPA TO 5.30 LPA
Urgent requirement for Manager mechanical maintenance sponge iron dri for reputed steel plant at Bilaspur CG location.
Handling mechanical activities in running maintenance, shutdown maintenance, preventive
maintenance and breakdown maintenance.
Monitoring the root cause of problems arising during routine maintenance work and implementing
systematic solution.
Preparation of preventive maintenance schedule & checklist.
Planning & controlling of ...
2 Opening(s)
20.0 Year(s) To 25.0 Year(s)
10.00 LPA TO 12.00 LPA
Description:
Require immediately for a leading STEEL INDUSTRIES and a highly reputed Group for General manager MECHANICAL for Operation /Sponge Iron Division 350*4 tpd 100*2 at In charge of Operation Department of SID plant at RAIPUR Location ,
Handling mechanical activities in running maintenance, shutdown maintenance, preventive
maintenance and breakdown maintenance.
Monitoring the root cause of ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 8.40 LPA
Urgent Requirement for Automobile maintenance head for Reputed Steel plant at jharsuguda Location.
inspection &maintenance of loader, jcb, hywa, trailer ,hydra ,forklift & all activities.
Responsible for day to day preventive maintenance & breakdown maintenance of Heavy equipment’s& machines of Plant.
Bearing checking, replacement of bearing and alignment of the various fans and ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.60 LPA
Working in hydraulic department. Maintenance lubrication system gear box lubrication.
maintenance of mill, shift handling as shift incharg manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
3.00 LPA TO 3.60 LPA
Working in hydraulic department. Maintenance lubrication system gear box lubrication.
maintenance of mill, shift handling as shift incharg manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 3.60 LPA
Ass. Engineer - block mill manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, pallet area, coil forming area. ,garret, funnel line, pinch roll, coiler, walking ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Monitoring and Maintaining of Equipment Maintenance details by SAP-PM Module method.
Preparing Reports for Month wise, Quarter Wise, Year Wise of Costing, Fuel Consumption, Spare&Wear Consumption, Wear parts &Tyre Life and monitors these reports.Budget Handling/Preparation for Future and Present Running Equipment’s.Spares planning for all Equipment’s.Maintaining and Handling of Equipment’s files related ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
Maintenance engineers undertake scheduled and breakdown maintenance of engineering equipment or plants. Maintenance engineers' work involves checking, repairing and servicing machinery, equipment, systems and infrastructures.
Maintenance engineering is a discipline that introduces engineering concepts to equipment maintenance. It enables companies to optimize maintenance procedures and improve machine performance in a cost-effective way.As systems, ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.20 LPA
Description:
Daily monitoring and control of energy consumption of the entire plant.
To ensure compliance with quality standards and maintain related documents.
To ensure the daily routine documentation and utility operation as well as attend the breakdown.
To ensure the Operation of pre-treatment of the water system.
To ensure the effluent treated plant operation, adherence ...