43 Job openings found

1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
5.00 LPA TO 5.40 LPA
Job Description: 1) Sets up and operates machine to bend metal structural shapes, such as bars, rods, angles, pipes, and tubes, to angle or contour specified by work order, drawings, templates, or layout: Selects and bolts holding clamp, die block, and guide clamp to machine. 2) Positions and clamps end stops on ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.04 LPA TO 2.40 LPA
Fabrication is the process of creating finished products from raw materials, especially metals, by cutting, shaping, and assembling them. It involves various techniques like welding, cutting, bending, and joining, often using machinery and specialized tools. Fabrication can be done on-site or in dedicated workshops.    Here's a more detailed look: Key aspects of fabrication: Raw Materials: Fabrication typically ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.60 LPA TO 4.80 LPA
Fabrication is the process of constructing a product from raw materials or individual parts, often involving cutting, shaping, and joining components. It's a versatile process used in various industries, including manufacturing, construction, and engineering. Fabrication can range from simple assembly to complex manufacturing processes, and it often involves specialized tools and techniques.    Key aspects ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.70 LPA TO 4.60 LPA
Fabrication is the process of creating finished products from raw materials, especially metals, by cutting, shaping, and assembling them. It involves various techniques like welding, cutting, bending, and joining, often using machinery and specialized tools. Fabrication can be done on-site or in dedicated workshops.    Here's a more detailed look: Key aspects of fabrication: Raw Materials: Fabrication typically ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.68 LPA TO 1.80 LPA
A "Tacker Welder" job typically involves the initial stages of welding, focusing on creating temporary "tack" welds to hold metal components together before final welding. This role requires strong attention to detail, ability to follow instructions, and proficiency with welding equipment, particularly MIG welding.    Key Responsibilities: Preparing and Positioning Metal: Tack welders are responsible for ...
10 Opening(s)
0.5 Year(s) To 1.0 Year(s)
1.00 LPA TO 1.20 LPA
Cottage will be provided Load and unload materials, tools, and equipment. Clean and prepare work areas and job sites. Assist skilled workers such as carpenters, masons, or technicians. Follow instructions from supervisors or team leaders. Operate basic tools and equipment safely (after training). Remove debris, trash, or hazardous materials as needed. Perform general duties to support the ...
1 Opening(s)
0 To 0
1.44 LPA TO 1.80 LPA
Relevant B.Sc degrees: A B.Sc in Chemistry, Physics, or Material Science can be particularly beneficial as these fields provide a foundation for understanding material properties and behaviors which are crucial in fabrication. Entry-level roles: Quality Inspector: Checking fabricated parts for dimensional accuracy, surface finish, and compliance with quality standards, utilizing measuring tools and inspection ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Description:   The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.92 LPA TO 2.04 LPA
Description:   The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
5 Opening(s)
3.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.40 LPA
Key Responsibilities: Interpretation of Engineering Drawings: Read and interpret engineering drawings, blueprints, and specifications to understand the requirements for each project. Translate technical drawings into physical structures by determining appropriate fabrication methods and sequences. Material Preparation: Select and prepare raw materials, such as steel plates, bars, and tubes, for fabrication. Cut, bend, and shape metal pieces ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile