ELECTRICIAN (POWER PLANT) - RAIGARH
Job Description:
-
Installation and Maintenance:Power plant electricians install, maintain, and repair electrical systems and equipment, including power distribution systems, control systems, lighting, and communication systems.
-
Troubleshooting and Repair:They diagnose and repair electrical problems in power plant equipment, using diagnostic tools and testing equipment.
-
Safety Compliance:They adhere to strict safety regulations and procedures, ensuring the safety of themselves and others while working with electrical equipment.
-
Preventive Maintenance:They perform routine preventive maintenance on electrical equipment to prevent breakdowns and ensure reliable operation.
-
System Monitoring:They monitor electrical systems, using software and other tools, to identify potential problems and ensure efficient operation.
- Technical Proficiency: They possess a strong understanding of electrical and electronic theory, including power generation, transmission, and distribution systems.
- Troubleshooting Skills: They are skilled in troubleshooting electrical problems, using diagnostic tools and testing equipment.
- Safety Awareness: They have a strong commitment to safety and adhere to all relevant safety regulations and procedures.
- Communication Skills: They can effectively communicate with other team members and supervisors.
- Problem-Solving Skills: They are able to analyze problems and develop effective solutions.
http://jobs.vinayakjob.com/
CONTACT DETAILS -
Name - MANISHA SAHU
Number - 9109993513
Key Skills :
Company Profile
Existing plant of 33,500 TPA of MS Ingots (only 16,750 TPA is commissioned) & 4800 TPA
of TMT Bar has obtained Consent from Regional Office - Raigarh, Chhattisgarh
Environment Conservation Board (CECB) vide letter no. 153/RO/TS/CECB/--- Raigarh
dt. 16th May ---.
? Obtained Environment Clearance for 90,000 TPA Sponge Iron, 33,500 TPA to 1,23,500
TPA of MS Billets, 90,000 TPA TMT Bars / Structural --- / Wire Rod Mill, WHRB Power
Plant (6 MW) & FBC Power Plant (12 MW) from MoEF, New Delhi vide F.No. J11011/308/2009/ IA II (I) dated 29th March 2011& 9th July 2018 (Validity Extension).
? Obtained Consent for Establishment for 90,000 TPA Sponge Iron, 33,500 TPA to
1,23,500 TPA of MS Billets, 90,000 TPA TMT Bars / Structural --- / Wire Rod Mill,
WHRB Power Plant (6 MW) & FBC Power Plant (12 MW) from CECB vide
4291/TS/CECB/2014 dated 21st October 2014.
Apply Now
- Interested candidates are requested to apply for this job.
- Recruiters will evaluate your candidature and will get in touch with you.