SHIFT INCHARGE ELECTRICAL SID FOR STEEL FABRICATOR - RAIPUR , CHHATTISGARH

SHIFT INCHARGE ELECTRICAL SID FOR STEEL FABRICATOR - RAIPUR , CHHATTISGARH

1 Nos.
145129
Full Time
5.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.00 LPA
Steel/Metal/Iron/Non-ferrous
B.Tech/B.E. - Electrical; B.Tech/B.E. - Mechanical
Job Description:
An Electrical Shift Incharge (SID - Sponge Iron Division / Steel Industry) manages plant electrical operations, routine maintenance, and fault troubleshooting during a designated shift. Key duties involve overseeing high/low tension (HT/LT) power systems, executing preventive maintenance schedules, and minimizing machinery downtime in heavy manufacturing units. 
Core Responsibilities
  • Maintenance Operations: Handle general electrical upkeep, lubrication, and rapid breakdown recovery for plant machinery.
  • Preventive Upkeep: Follow scheduled preventive maintenance routines and log equipment service history.
  • Resource Management: Prepare material indents for electrical and mechanical spares.
  • System Monitoring: Oversee switchgear, transformers, drives (VFDs), and control panels.
  • Safety Compliance: Enforce factory safety rules and secure proper isolation protocols during repairs. 
Job Requirements
  • Qualification: Diploma or B.Tech/B.E. in Electrical Engineering (or ITI for technical support tiers).
  • Experience: 4 to 10 years of hands-on industrial plant experience, preferably in steel, power, or metal sectors.
  • Key Skills: High/Low tension system handling, fault diagnosis, team supervision, and basic automation awareness. 
If you are applying for a specific role or hiring for a plant, tell me:
  • The exact plant type (Sponge Iron, Rolling Mill, Power Plant)
  • The required shift rotation pattern or experience level

JOB APPLY

http://jobs.vinayakjob.com/

CONTACT DETAILS -
Name - ANJALI
Number - 95034 51559

Company Profile

Our Client is an integrated --- plant + Installed Capacity Installed Capacity of Direct Reduced Iron i.e. Sponge Iron 60,000 TPA Under Implementation ---ndash; (Work in Progress) --- Ingots and Billets (Induction Furnace 2 x 8 MT 57,600 TPA Captive --- Plant (6MW Waste Heat Recovery Based and 4 MW Coal based) 10 MW

---nbsp;

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs