1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
9.00 LPA TO 10.00 LPA
Candidate should have min. 10-12 years of relevant post qualification experience of Power Based combined cycle co-generation
powerplant
& utility. He must have experience of Maintenance and trouble shooting in Gas Turbine , Process Steam Boiler/ Turbine & HRSG operation of 39MW and above capacity of each unit and, Cooling tower and auxiliaries.He ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
"Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems.
Provide technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power plants :
Generator, UAT / ST and Generator transformer, Plant Aux equipment's like ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
1. Key SLD, Protection & Metering SLD
2. Design Basis Reports
3. Sizing calculations / Equipment selection
4. System studies using ETAP
5. Protection, Synchronisation, Control & Metering scheme drawings of Generators, Transformers, Switchgear, Switchyard, Reactors and Lines
6. Networking architecture including IEC61850
7. Relay setting calculation and Parameterisation
8. Control interfaces with DDCMIS, EDMS, ECP
9. Cable ...