4 Opening(s)
3.0 Year(s) To 8.0 Year(s)
1.80 LPA TO 2.40 LPA
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 10.00 LPA
AGM CONTROL & INSTRUMENTATION-POWER PLANT
Description:
You'll need to develop skills in specific control disciplines, such as:
advanced process control (APC)
distributed control systems (DCS)
programmable logic controllers (PLC)
supervisory control and data acquisition (SCADA).
The use of these disciplines will depend on the exact nature of your individual job. In general however, tasks and responsibilities can ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 10.00 LPA
You'll need to develop skills in specific control disciplines, such as:
advanced process control (APC)
distributed control systems (DCS)
programmable logic controllers (PLC)
supervisory control and data acquisition (SCADA).
The use of these disciplines will depend on the exact nature of your individual job. In general however, tasks and responsibilities can include:
designing and developing new ...
2 Opening(s)
3.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.40 LPA
Experience in steam and gas turbine too will be preferred Should be able to work independently with minimum supervision Experience in repair, maintenance, overhauling and final assembly Adherence to Safety regulations He must have experience of Maintenance and trouble shooting in Gas Turbine , Process Steam Boiler/ Turbine & HRSG operation of 39MW and above ...