1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.80 LPA
Data management, and report Assessment evaluation and prediction of all ongoing projects and also for upcoming. Filing,scanning,composing correspondences,data entry reports maintaining record. Material management and dispatches, inspection & compliance to quality requirement & design. Material procurement and inspection. Coordination with intra-dpt for timely project completion.
Data management, and report Assessment evaluation ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 6.00 LPA
We Are Currently Looking for RMP Operator For Steel Plant at West Africa Nigeria Location
Vendor Management including contracting, driving to adherence to performance metrics in cost reduction, rationalization, lead time, quality compliance.
- Responsible for resolution of all issues related to quality, specifications, revalidations, damages/losses, etc.
- Track relevant markets for gathering ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 6.00 LPA
Urgent requirement production Planning Engineer at West Africa Nigeria Location
Production planning engineer department for heavy engineering for all process equipment trading development
Working out by using different kinds of raw materials to get lower production cost.Decision of charge mix & controlling of process parameter for better quality.Controlling of raw material handling system ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 10.00 LPA
? Production Planning & Scheduling? Production Target and Output? Operations & Maintenance? Process control & Quality assurance? Resource Material consumptionManagement and control? Casting Defect Analysis? Green Sand Molding System Knowledge? High pressure Machine Molding? Coordination with Metallurgical LabOperations? Melting Operation Charge Calculation? Molding Shop Operation & Output? Core Shop Operation ...
2 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.00 LPA TO 5.00 LPA
Having sound knowledge of direct reduction process. Process Control, Quick Reference Temperature, Control Room Operation and Raw Material Characteristics running smoothly to plant. Most important is that maintain KILN campaign life longer, high quality product and achieve excess production in a Campaign
Establishes better production, minimum wastages.
Observe for smooth supply of ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
50.00 LPA TO 80.00 LPA
Head of Project & Operation of all units and the unit heads of all operational
units as well as Projects are reporting to Plant Head.? Plant operation activities, encompassing production planning, Raw Materialprocurement, Quality Assurance , Resource Management to achieve thetargets or and desired results.? Ensuring cost effectiveness of products through ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 20.00 LPA
Mega Walkin Interview for Sr.Manager/Manager BENEFICIATION for Reputed Integrated Steel plant at Nigeria (West Africa) Location.
Having sound knowledge of direct reduction process. Process Control, Quick Reference Temperature, Control Room Operation and Raw Material Characteristics running smoothly to plant. Most important is that maintain KILN campaign life longer, high quality product and ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
50.00 LPA TO 80.00 LPA
Urgent requirement General manager (Metallurgy) for Benefaction ( 350*4 tpd) at Nigeria (West Africa)
Annual Production & Raw material planning as per Management.
Ensure that the production is cost effective;
Quality compliance. / Environment & OHS Compliance.
Inventory control through Controlling Sp. Consumption.
Continuous improvement in process & overall department performance.
Monitor the production and Quality as ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
50.00 LPA TO 80.00 LPA
Urgent requirement General manager (Metallugy) for Operation /Sponge Iron Division ( 350*4 tpd) at Nigeria (West Africa)
Incharge of Opration Department of SID plant ,
Annual Production & Raw material planning as per Management.
Ensure that the production is cost effective;
Quality compliance. / Environment & OHS Compliance.
Inventory control through Controlling Sp. Consumption.
Continuous improvement in ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.16 LPA TO 2.40 LPA
Urgent requirement production Planning Engineer at Bhilai Location
Production planning engineer department for heavy engineering for all process equipment trading development
Working out by using different kinds of raw materials to get lower production cost.Decision of charge mix & controlling of process parameter for better quality.Controlling of raw material handling system as per ...