1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 7.20 LPA
Job Title: Production Manager (Hot Strips Mill)
Job Summary:
We are seeking an experienced Production Manager to oversee the Hot Strips Mill operation. The successful candidate will be responsible for managing the production process, ensuring timely delivery of high-quality products, and maintaining a safe working environment.
Key Responsibilities:
Production Planning and Control:
Develop and implement ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.00 LPA TO 6.00 LPA
Job Title: Electrical Manager (Rolling Mill)
Job Summary:
The Electrical Manager will oversee the electrical systems, equipment, and maintenance operations at our rolling mill facility. This critical role ensures efficient, reliable, and safe electrical power distribution and utilization, supporting overall plant productivity and profitability.
Key Responsibilities:
Electrical Maintenance and Repair: Manage preventive maintenance, troubleshooting, ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
3.60 LPA TO 4.80 LPA
Tasks and duties
Determining specifications for components to be created based on blueprints for mechanical systems.
Measuring and constructing components out of raw materials through cutting, shaping, and grinding.
Assembling fabricated components into a larger machine or system.
Complying with operations, safety, and maintenance procedures.
Understanding and interpreting diagrams, blueprints, drawings, and specifications to determine ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.00 LPA TO 3.00 LPA
A scrap yard supervisor oversees daily operations, ensuring efficient and safe material handling, inventory management, and compliance with regulations, while also supervising and training yard staff.
Here's a more detailed breakdown of a scrap yard supervisor's responsibilities:
Key Responsibilities:
Supervision and Leadership:
Supervise and direct yard staff, assigning tasks and ensuring efficient workflow.
Train and coach ...
1 Opening(s)
30.0 Year(s) To 35.0 Year(s)
50.00 LPA TO 75.00 LPA
The CEO (Chief Executive Officer) and COO (Chief Operating Officer) of an integrated steel plant are responsible for the company's leadership and operations.
CEO Responsibilities
Provide leadership for the company's internal and external operations
Develop and execute a strategic plan to increase revenue, profitability, and growth
Identify acquisition opportunities and manage integration activities
Have a strong ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
Mill Supervisor Job Description
Besse Forest Products Group , headquartered in Gladstone, MI, is one of the leading producers of hardwood lumber, veneer, and plywood in North America operating four sawmills, one lumber concentration yard, three veneer mills, one plywood plant, and employs over 350 people.
We are currently seeking a Hardwood ...
1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
8.00 LPA TO 10.00 LPA
Industry Type:- CONSTRUCTION
General Responsibilities:- Working as a Head of Department, Responsible for Vehicle Management, supervising shop operation , assisting mechanics, Scheduling, assigning service, maintenance and repair needs like spares etc. repairing, servicing and maintaining loader, Tipper, Hydraulic Mobile Crane, 3d backhoe loader, Tractor, Sweeping M/c, DG Set, Diesel Engine, Compressor, etc. ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 10.00 LPA
Direct and manage all plant operations with overall responsibilities for production, maintenance, quality and other production-related activities. Coordinate plant activities through planning with departments' managers to insure the total manufacturing objectives are accomplished in a timely and cost effective manner.
Direct and manage all plant operations with overall responsibilities for production, ...
5 Opening(s)
10.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 8.00 LPA
senior level are preferred. 10 to 15 years post qualification experience in planning, execution and administration and seed productionat senior level.
Manage & achieve production plan of Cipla at contract manufacturing sites by optimum utilization of resources in order to meet business plan
Manage production planning for contract manufacturing sites to achieve production targets
Plan for capacity enhancement to meet ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
30.00 LPA TO 36.00 LPA
STEEL PLANT CONFIGURATION-SPONGE IRON 100*8,FURNACE - 20*4 TON,TMT -2 LAC TPA,POWER PLANT-70 MW,BLAST FURNACE-250 METER,FERROUS ALLOYS-15*2MVACALL FOR 0771 4268132/9009777337
The Details of present Services are as follows :
Over all responsible for production,maintenance,quality Control and planning of Pellet Plant ,sponge iron plant ,SMS,Power Plant and rolling mill as per targe
Over all responsible ...