1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 12.00 LPA
Urgent Requirement for MECHANICAL FOREMAN -SMS steel for Reputed Steel plant.
Would be handling the mechanical maintenance and capable to handle shift and also general shift activities
like planning, spare management, spare procurement planning.
New spare parts development by machining and indenting of
material to minimize the breakdown time.
Improving Overall Equipment Effectiveness of machines ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
rgent Requirement for dy manager/manager MECHANICAL MAINTENANCE - FERRO ALLOYS DIVISION for Reputed Steel plant.
Planning people, Team management and Material requirement.Close monitoring and downtime analysis of day-to-day breakdown of m/c.Planning and scheduling of maintenance program on preventive basis.Executing capital repairs and modification as per the requirement.Safety, upkeep of machineries & care of ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 3.60 LPA
We Are Currently Looking for Engineer/Sr Engineer for Mechanical maintenance for Pellet for reputed integrated steel plant at Raipur location.
As Engineer/Sr Engineer for responsibilities includes individual shift operation, maintaining grade, following temperature, assuring feeding profile, proximate analysis of coal, size of raw material & product stock.
* Safety precaution from process on any kind ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.80 LPA TO 6.00 LPA
Monitoring, supervising and coordinating the maintenance & operation of mechanical equipment, E.O.T crane (5 ton to 300 ton) Charging Crane, Mixture Crane
https://admin.vinayakjob.com/ats/opening/all-opening/
Leading technical and ensuring targets are achieved, preparing annual budget, managing material inventory and plant expansion works
Monitoring, supervising and coordinating the maintenance of Mechanical equipment Plan, schedule, conduct, coordinate ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.50 LPA
Urgent Requirement of Engineer -Mechanical Maintenance for ferro alloys Divison at Rourkela Location.ferro alloysMaintenance Of Dryer, Vibrating Screen And Briquite Press. Maintenance Of Belt Pulley, DE System And Gearboxes. Scheduling Of Shutdown Jobs , Schduling Of Spare Parts & Handling Manpower.Position Sr.Engineer/Assistant Manager Mechanical Ferro AlloyERRO ALLOYS :-Maintenance Of Conveyor ...
5 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.50 LPA TO 5.00 LPA
Mega Walkin Interview for Engineer/Sr Engineer Mechanical Maintenance SMS(EAF/LRF) for Reputed Integrated Steel Plant at Orissa Location
Checking EAF hydraulic operations by maintaining good quality oil by keeping track through samples.
* Maintenance of Roof Gantry movement, Roof lifting unit, EAF Tilting, EAF locking, EBT M/C PM for
smooth operation, EBT Slag cutter ...
5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.00 LPA
Walk in Interview for Shift Incharge mechanical maintenance for sponge iron for reputed integrated steel plant at Orissa Location.
Lead the total Mechanical maintenance team of TPD sponge iron plant for the maintenance of various equipments and machineries used in the plant which includes 100TPD Kiln, Cooler, screw compressors, lobe compressors, ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.80 LPA TO 5.30 LPA
Urgent requirement for Manager mechanical maintenance sponge iron dri for reputed steel plant at Bilaspur CG location.
Handling mechanical activities in running maintenance, shutdown maintenance, preventive
maintenance and breakdown maintenance.
Monitoring the root cause of problems arising during routine maintenance work and implementing
systematic solution.
Preparation of preventive maintenance schedule & checklist.
Planning & controlling of ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 12.00 LPA
Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S.
? Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s.
? Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept.
? Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents.
? Maintaining ISO, spare parts development, modification, replacement history documentation.
? Daily Job ...
3 Opening(s)
4.0 Year(s) To 8.0 Year(s)
2.00 LPA TO 3.50 LPA
1) Responsible for General Electrical/Mechenical Maintenance, Break-down Maintenance and Lubrication of Machinery & Equipments.2) Responsible for periodical preventive maintenance schedules of all Machinery & Equipments and maintain their records from time to time.3) Responsible for preparation of material indents for all Mechanical & Electrical/Mechanical Spares
4) Ensure to follow Safety Guidelines and address the issues ...