124 Job openings found

1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 3.60 LPA
Urgent Requirement of Instrument Engineer for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress. Turbine control system testing, tweaking and commissioning Plant DCS system (Boiler and BOP) testing, ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.60 LPA
A Senior Electrical Engineer (Power Plant) oversees and maintains the electrical systems in a power generation facility, ensuring safe and efficient operation through tasks like system monitoring, troubleshooting, technical guidance to junior staff, equipment inspection, and electrical maintenance for turbines, generators, switchgear, and power distribution systems. This role requires deep knowledge of ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
2.50 LPA TO 3.00 LPA
Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT ENGINEER informed of progress. Hands on work for Trouble-shooting, repairing and maintaining efficiently a ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.00 LPA
B.E/Diploma (Mech.) with 5 to 10 years experience as a DCS Engineer in  a Power Plant in operation. Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control circuit, monitoring,DCS, PLC etc.To be familiar with all equipment in plants, maintain all maintenance equipments accurate documents ...
1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
25.00 LPA TO 30.00 LPA
We Are Currently looking for Project Head for reputed Steel plant at ORISSA Location. commissioning of following Projects Working as Project Lead blast furnace,SINTER PLANT  F proper, cast house, Stoves, Slag granulation plant, Gas cleaning plant, TRT, Coal injection plant, water & utility system, AC and ventilation systems, Electrical & instrumentation works, CH FE system and ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.50 LPA TO 2.40 LPA
Urgent requirement of DCS Engineer/Operator for 33 MW Power Plant,B.E/Diploma (Mech./Electrical) with 3 to 5 years experience as a DCS Operator/Engineer in Power Plant in operation.Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control circuit, monitoring,DCS, PLC ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 4.00 LPA
Responsibilities plant availability & instrumentation and DCS Responsibilities PM & shutdown maintenance work  Measuring of health PLC & DCS & continue monitoring and calibration  Identifying maintenance issues  reporting in relation to plant equipment & accessories & recommending for process or system contributing to plane work & allocation of task to assist with appropriate decision ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.44 LPA TO 1.80 LPA
Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress. Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 16.00 LPA
  Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S. ?          Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s. ?          Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept. ?          Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents. ?          Maintaining ISO, spare parts development, modification, replacement history documentation. ?          Daily Job ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 12.00 LPA
  Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S. ?          Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s. ?          Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept. ?          Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents. ?          Maintaining ISO, spare parts development, modification, replacement history documentation. ?          Daily Job ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile