4 Opening(s)
0 To 1.0 Year(s)
1.80 LPA TO 2.16 LPA
Metallurgists study the properties of metals and then apply their findings to practical applications, such as metal production. They work with a range of metals including copper, precious metals, iron, steel, zinc and aluminium alloys. Metallurgists can work in a number of areas including civil engineering, aircraft manufacture, automotive engineering ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 9.00 LPA
Urgent Requirement for production manager(sms) for reputed steel plant at raipur location.
Achieve Daily/Weekly/Monthly production target.Planning of different grades given by PPC Dept.Preparation of charge mix & melting of charge mix in furnaces.Special Grades making, process improvement & Quality improvement.
Cost reduction, planning of sequence casting & ingot casting.Ingot (pitside) raw material ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.16 LPA TO 3.00 LPA
A "Process Melter" in an SMS (Steel Melting Shop) ITI (Industrial Training Institute) program refers to a trainee or operator who is learning to work with equipment and processes involved in melting and refining steel within a steel manufacturing facility. This role focuses on the initial stages of steel production, where ...
1 Opening(s)
15.0 Year(s) To 16.0 Year(s)
3.60 LPA TO 6.00 LPA
An Electrician/Foreman in a power plant is responsible for overseeing the installation, maintenance, repair, and testing of high-voltage systems, generators, motors, and electrical equipment to ensure maximum uptime, safety, and operational efficiency. They lead crews, interpret blueprints, and troubleshoot complex electrical issues, ensuring strict compliance with safety codes and plant regulations.
Key ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 2.00 LPA
Operate conveyor belt to move objects.
Control speed and route of objects.
Take orders to have materials, products, or machinery moved.
Wait for incoming shipments and estimate delivery times.
Join sections of conveyor frames at temporary working areas, and connect power units.
Clean conveyor belt and remove debris.
Oil belts to ensure they move properly.
Move, assemble, ...
2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 2.00 LPA
Job Description of 2nd class Boiler Operator:
Responsible for operation of Boiler,Biomass boiler DM/Power Plant .WHRB Boiler including de-aerator operations Steam turbines and steam networksResponsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over after maintenance Issuance of ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 20.00 LPA
Urgent Requirement for GENERAL MANAGER - INDUCTION FURNACE (EXPERIENCE 10tn, 12TN, 15TN, 20TN furnace) for Reputed Steel plant.
Achieve Daily/Weekly/Monthly production target.Planning of different grades given by PPC Dept.Preparation of charge mix & melting of charge mix in furnaces.Special Grades making, process improvement & Quality improvement.Cost reduction, planning of sequence casting & ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 5.00 LPA
Urgent Requirement for AGM/DGM PRODUCTION - INDUCTION FURNACE (EXPERIENCE 10tn, 12TN, 15TN, 20TN furnace) for Reputed Steel plant.
Achieve Daily/Weekly/Monthly production target.Planning of different grades given by PPC Dept.Preparation of charge mix & melting of charge mix in furnaces.Special Grades making, process improvement & Quality improvement.Cost reduction, planning of sequence casting ...
3 Opening(s)
4.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.16 LPA
A CCM Fitter (SMS) in a Steel Melting Shop (SMS) is responsible for the fitting, assembly, and maintenance of mechanical components within the continuous casting machine (CCM) and other equipment in the steelmaking process. They work with various tools and machinery to fabricate, assemble, and repair parts, ensuring the smooth and efficient ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
15.00 LPA TO 25.00 LPA
Urgent Requirement for HEAD SMS INDUCTION FURNACE (EXPERIENCE 10tn, 12TN, 15TN, 20TN furnace) for Reputed Steel plant.
Achieve Daily/Weekly/Monthly production target.Planning of different grades given by PPC Dept.Preparation of charge mix & melting of charge mix in furnaces.Special Grades making, process improvement & Quality improvement.Cost reduction, planning of sequence casting & ...