1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 12.00 LPA
Coordinating the development and implementation of key procurement strategies and ensuring that strategies are aligned with organizational objectives.Dealing executive for Bulk Raw Material/Production Consumables and Capital/Project Procurement Bulk rawmaterial like scraps, Ferro Alloys like High Carbon & Low Carbon Ferro Chrome, Ferro silicon in lumps and powder form H.C. & L.C. Ferro Manganese. APC material, ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
30.00 LPA TO 36.00 LPA
STEEL PLANT CONFIGURATION-SPONGE IRON 100*8,FURNACE - 20*4 TON,TMT -2 LAC TPA,POWER PLANT-70 MW,BLAST FURNACE-250 METER,FERROUS ALLOYS-15*2MVACALL FOR 0771 4268132/9009777337
The Details of present Services are as follows :
Over all responsible for production,maintenance,quality Control and planning of Pellet Plant ,sponge iron plant ,SMS,Power Plant and rolling mill as per targe
Over all responsible ...
1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 4.00 LPA
Urgent Requirement for Sr Manager Projects for Reputed Steel Plant at Chandrapur Location.
Capable of planning and executing project work, in Sponge Iron/Steel plants/Rolling mills/SMS.Age minimum 35 to 40 year .auto cad and project a management software
BudgetingExecutingPlanningPurchaseCoordinating with project consultants, vendors and contractors.
Urgent Requirement for Sr Manager Projects for Reputed Steel ...
1 Opening(s)
6.0 Year(s) To 11.0 Year(s)
4.00 LPA TO 4.80 LPA
Urgent requirement for LRF Engineer Operation for Reputed Steel Plant at Jharsuguda Location
Responsible for LRF Operation having : sound of secondary metallurgy,knowledge of dephosphorisation in ladle through induction furnace root awarness of safty requirements at inuduction furnace, manage the manpower of shift coordination with IF and CCm Ladle Refining Furnaces
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
1.50 LPA TO 2.50 LPA
· 5+ years of relevant experience as a Melter
· Salary 15000/- to 20000/- PM
Candidate should have experience in induction furnace operation ,lining and sintering.
he shall co-ordinater with crane operator for charging and tapping for molten metal in induction furnace.
Candidate should have experience in induction furnace operation ,lining and sintering.
he shall ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.16 LPA TO 2.64 LPA
Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Locates and marks bending and cutting lines onto work piece, allowing for stock thickness
JOB ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.80 LPA
A Melter in a Steel Melting Shop (SMS) operates and manages furnaces (such as induction furnaces or EAFs) to melt raw materials into molten steel. They are responsible for controlling temperature, chemical composition, managing slag, and tapping metal while ensuring strict safety protocols in extreme heat environments.
Key Responsibilities
Furnace Operation: Safely ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 7.20 LPA
The Quality In-Charge in a steel plant oversees raw materials, in-process production, and finished goods (e.g., TMT bars, structural steel) to meet chemical, mechanical, and physical standards. They lead the testing laboratory, enforce compliance, and minimize product rejections.
Key Responsibilities
Quality Inspections: Test raw materials (scrap, sponge iron), monitor temperatures/chemistry in the ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
18.00 LPA TO 24.00 LPA
Lead and manage all operations of the Wire Rod Mill (WRM) to achieve production, quality, cost, and delivery targets.
Develop production plans and ensure smooth execution of rolling mill operations as per business requirements.
Monitor billet charging, rolling, finishing, cooling, coiling, and dispatch processes for maximum productivity.
Optimize mill performance, rolling parameters, yield, ...
1 Opening(s)
7.0 Year(s) To 10.0 Year(s)
4.20 LPA TO 5.40 LPA
A Shift Incharge in a Ferro Alloys plant supervises daily Submerged Arc Furnace (SAF) operations. They manage production targets, monitor process parameters, ensure optimal raw material charging, and enforce safety (HSE) protocols during their shift. [1, 2, 3]
Key Responsibilities
Production Management: Oversee the end-to-end smelting process from raw material charging to ...