1 Opening(s)
									 
									12.0 Year(s) To 15.0 Year(s)								
							
									 
									9.00 LPA TO 10.00 LPA								
							
									We Are Currently looking for Project Head for reputed Steel plant In SMS (20*4 TON FURNACE) at Chhattisgarh Location.
commissioning of following Projects
Working as Project Lead steel melting shop,,
Monitoring/ tracking projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of the sameManaging overall operations for executing ... 
								
							1 Opening(s)
									 
									10.0 Year(s) To 12.0 Year(s)								
							
									 
									5.00 LPA TO 6.00 LPA								
							
									Urgent Requirement of MANAGER -Electrical CLU Converter at JHARKHAND Location Maintenance Of Dryer, Vibrating Screen And Briquite Press. Maintenance Of Belt Pulley, DE System And Gearboxes. Scheduling Of Shutdown Jobs , Schduling Of Spare Parts & Handling Manpower.
Supervised the Maintenance Management staff & conducted performance reviews of workers and technician.
Provided strong leadership & ... 
								
							1 Opening(s)
									 
									10.0 Year(s) To 12.0 Year(s)								
							
									 
									8.00 LPA TO 9.00 LPA								
							
									age limit 33-35 year
the job all taking responsibilities of over all management for the entire furnace starting from raw material, batching, electrode management, tapping, furnace operation till the final product with an assurance , of quality product,
ensure to knowledge of full composition of metal, slag by product raw material of ... 
								
							1 Opening(s)
									 
									10.0 Year(s) To 12.0 Year(s)								
							
									 
									8.00 LPA TO 10.00 LPA								
							
									Sr MANAGER/MANAGER -  MECHANICAL MAINTENANCE (FERRO ALLOYS)
Urgent Requirement of Assistant Engineer -Mechanical Maintenance for ferro alloys  Divison at raipur Location.ferro alloysMaintenance Of Dryer, Vibrating Screen And Briquite Press. Maintenance Of Belt Pulley, DE System And Gearboxes. Scheduling Of Shutdown Jobs , Schduling Of Spare Parts & Handling Manpower.
Supervised the Maintenance ... 
								
							1 Opening(s)
									 
									8.0 Year(s) To 10.0 Year(s)								
							
									 
									2.50 LPA TO 3.00 LPA								
							
									Description:
 
Urgent requirement for LRF OPERATOR Operation for Reputed Steel Plant at ODISHA Location
Responsible for LRF Operation having : sound of secondary metallurgy,knowledge of dephosphorisation in ladle through induction furnace root awarness of safty requirements at inuduction furnace, manage the manpower of shift coordination with IF and CCm Ladle Refining Furnaces 
								
							2 Opening(s)
									 
									8.0 Year(s) To 10.0 Year(s)								
							
									 
									2.50 LPA TO 3.00 LPA								
							
									rgent Requirement for Shift incharge  steel melting shop LRF/induction furnace/EAF for Reputed Steel plant.
Planning people, Team management and Material requirement.Close monitoring and downtime analysis of day-to-day breakdown of m/c.Planning and scheduling of maintenance program on preventive basis.Executing capital repairs and modification as per the requirement.Safety, upkeep of machineries & care of ... 
								
							1 Opening(s)
									 
									25.0 Year(s) To 30.0 Year(s)								
							
									 
									30.00 LPA TO 36.00 LPA								
							
									STEEL PLANT CONFIGURATION-SPONGE IRON 100*8,FURNACE - 20*4 TON,TMT -2 LAC TPA,POWER PLANT-70 MW,BLAST FURNACE-250 METER,FERROUS ALLOYS-15*2MVACALL FOR 0771 4268132/9009777337
 
The Details of present Services are as follows :
Over all responsible for production,maintenance,quality Control and planning of  Pellet Plant ,sponge iron plant ,SMS,Power Plant and rolling mill as per targe
Over all responsible ... 
								
							1 Opening(s)
									 
									6.0 Year(s) To 11.0 Year(s)								
							
									 
									4.00 LPA TO 4.80 LPA								
							
									Urgent requirement for LRF Engineer Operation for Reputed Steel Plant at Jharsuguda Location
Responsible for LRF Operation having : sound of secondary metallurgy,knowledge of dephosphorisation in ladle through induction furnace root awarness of safty requirements at inuduction furnace, manage the manpower of shift coordination with IF and CCm Ladle Refining Furnaces 
								
							2 Opening(s)
									 
									3.0 Year(s) To 5.0 Year(s)								
							
									 
									2.00 LPA TO 5.00 LPA								
							
									
Ferroalloys in AOD Steelmaking:
Purpose:
Ferroalloys are used in AOD steelmaking to add specific alloying elements (like chromium, manganese, silicon, etc.) to the molten steel to achieve desired properties. 
 
Types of Ferroalloys:
Common ferroalloys used in AOD include ferromanganese (FeMn), ferrochromium (FeCr), ferrosilicon (FeSi), and ferromolybdenum (FeMo). 
 
Process:
AOD is a refining process that uses argon ... 
								
							1 Opening(s)
									 
									25.0 Year(s) To 30.0 Year(s)								
							
									 
									18.00 LPA TO 24.00 LPA								
							
									mechanical maintenance of mill, &equipment's like  ejector ,blowers, furnace,  pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box,  laying head ,conveyor, pallet area, coil forming area. ,garret,  funnel line, pinch roll, coiler, walking beam , accumulator, hydraulic unit, grease unit, lubrication unit, compressors, pumps, cooling tower, dg ...