138 Job openings found

1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
2.50 LPA TO 3.00 LPA
Description:   Urgent requirement for LRF OPERATOR Operation for Reputed Steel Plant at ODISHA Location Responsible for LRF Operation having : sound of secondary metallurgy,knowledge of dephosphorisation in ladle through induction furnace root awarness of safty requirements at inuduction furnace, manage the manpower of shift coordination with IF and CCm Ladle Refining Furnaces
2 Opening(s)
8.0 Year(s) To 10.0 Year(s)
2.50 LPA TO 3.00 LPA
rgent Requirement for Shift incharge  steel melting shop LRF/induction furnace/EAF for Reputed Steel plant. Planning people, Team management and Material requirement.Close monitoring and downtime analysis of day-to-day breakdown of m/c.Planning and scheduling of maintenance program on preventive basis.Executing capital repairs and modification as per the requirement.Safety, upkeep of machineries & care of ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
30.00 LPA TO 36.00 LPA
STEEL PLANT CONFIGURATION-SPONGE IRON 100*8,FURNACE - 20*4 TON,TMT -2 LAC TPA,POWER PLANT-70 MW,BLAST FURNACE-250 METER,FERROUS ALLOYS-15*2MVACALL FOR 0771 4268132/9009777337   The Details of present Services are as follows : Over all responsible for production,maintenance,quality Control and planning of  Pellet Plant ,sponge iron plant ,SMS,Power Plant and rolling mill as per targe Over all responsible ...
1 Opening(s)
6.0 Year(s) To 11.0 Year(s)
4.00 LPA TO 4.80 LPA
Urgent requirement for LRF Engineer Operation for Reputed Steel Plant at Jharsuguda Location Responsible for LRF Operation having : sound of secondary metallurgy,knowledge of dephosphorisation in ladle through induction furnace root awarness of safty requirements at inuduction furnace, manage the manpower of shift coordination with IF and CCm Ladle Refining Furnaces
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
15.00 LPA TO 25.00 LPA
Core Skills & Expertise Captive Power Plant (CPP) Operations: Expertise in managing on-site power generation facilities, often utilizing by-product fuels from steel manufacturing. Energy Management Systems (EMS): Implementation and operation of systems for energy monitoring, modeling, and optimization. Utilities Management: Oversight of all plant utilities including power distribution, water management, and waste treatment. Process Optimization: Driving efficiency and ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.60 LPA TO 4.20 LPA
  📄 Job Description: We are seeking a qualified and experienced QC Lab Shift Incharge to oversee quality testing activities during assigned shifts. The ideal candidate should have strong knowledge of lab procedures, testing methods, and quality standards relevant to raw materials and finished products. This role requires leadership in shift operations ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Ferroalloys in AOD Steelmaking: Purpose: Ferroalloys are used in AOD steelmaking to add specific alloying elements (like chromium, manganese, silicon, etc.) to the molten steel to achieve desired properties.    Types of Ferroalloys: Common ferroalloys used in AOD include ferromanganese (FeMn), ferrochromium (FeCr), ferrosilicon (FeSi), and ferromolybdenum (FeMo).    Process: AOD is a refining process that uses argon ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
18.00 LPA TO 24.00 LPA
mechanical maintenance of mill, &equipment's like  ejector ,blowers, furnace,  pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box,  laying head ,conveyor, pallet area, coil forming area. ,garret,  funnel line, pinch roll, coiler, walking beam , accumulator, hydraulic unit, grease unit, lubrication unit, compressors, pumps, cooling tower, dg ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 18.00 LPA
To administer timely task completion, manpower allocation and scheduled running of mechanical, preventive, operational & break down maintenance. To ensure assigned tasks are timely completed and recorded whenever required. Responsible for timely fault finding, repair & maintenance of both auxiliary as well as furnace operations in ferro plant. Ensure that mechanical costing ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
30.00 LPA TO 42.00 LPA
Job Summary :Briefly summarize your position's purpose or Role and its scope- Ensure cost effective and energy efficient production processes for different grade & quality of steelDuties And Responsibilities :Primary Duties & Responsibilities- Work in close coordination with PPC, Mills and Blast Furnace, Sinter Plant for preparing monthly operational Plan ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile