1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 6.60 LPA
Electrical Engineering Manager Job Responsibilities: In this section, you’ll want to use a bulleted list to explain the role’s responsibilities in order of importance, as illustrated below.
Achieves optimal electrical system operational efficiency by developing and maintaining electrical systems.
Accomplishes operational objectives by recruiting, onboarding, and managing employees.
Communicates job expectations, monitoring and reviews ...
1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
10.80 LPA TO 12.00 LPA
Urgent Requirement of Electrical Head-Maintenance for SMS Division at Raipur Location.3
Operation of HT/LT Panels, switchgear, Transformer, MCC/PCC panel, Motors Starters, Timers.
Preventive and general Electrical maintenance as per schedule.
Parallel operation of alternators and their load sharing.
Designing, testing, wiring, servicing and commissioning of all type of control and power panel i.e. MCC, ...
1 Opening(s)
2.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 5.00 LPA
URGENT REQUIREMENT FOR ELECTRICAL INCHARGE FOR REPUTE D PELLET BENEFICIATION PLANT AT BHILAI LOCATION
URGENT REQUIREMENT FOR ELECTRICAL INCHARGE FOR REPUTE D PELLET BENEFICIATION PLANT AT BHILAI LOCATION
URGENT REQUIREMENT FOR ELECTRICAL INCHARGE FOR REPUTE D PELLET BENEFICIATION PLANT AT BHILAI LOCATION
URGENT REQUIREMENT FOR ELECTRICAL INCHARGE FOR REPUTE D PELLET BENEFICIATION PLANT ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 6.00 LPA
Mechanical site engineers have a passion for solving problems and understanding the mechanics that make machines work. The following are the most common skills needed to succeed as a mechanical site engineer:
Project management - planning out the size, scope, and resources necessary to complete a project
Manual dexterity - using hand tools and ...
1 Opening(s)
0 To 2.0 Year(s)
0.83 LPA TO 1.00 LPA
Job Description:
Electrical engineers design, develop and maintain electrical systems for buildings, transport systems and power distribution networks. They work in and across many industries, such as construction, transport, energy (including renewables), building services, and manufacturing.
An Electrical Engineer is a skilled professional specializing in the design and development of electricity-related products, such ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.00 LPA
Description:
Electrical engineers develop and test electronic products and systems for a wide range of projects, from small-scale (e.g. household devices) to large-scale (e.g. electrical power systems). They operate in several disciplines, such as Power Engineering, Signal Processing, and Micro-electronics, based on their expertise.
What does an electrical engineer do?
Electrical engineers apply ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
We are looking for Electrical & Instrumentation Engineer for SOLANT Industry,
Candidate should be well aware with PLC- SCADA , AC Drives , Controllers , Process control, automation, electrical &electronics malfunction root cause & trouble shooting , corrective actions, schedule checks and calibration of process and , safety controls.
Candidate should be well aware with PLC- ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
3.60 LPA TO 4.20 LPA
Responsible for Execution of Electrical systems in Site Check Electrical, designs and drawings received from consultants.Coordinate with MEP Services consultant, Vendors, Contractors.Check detailed estimates for various services.Design & ITC of Electrical System within the estimated cost and Time schedules Monitoring the Project: Site Activity Management, Preliminary site preparation etc Commissioning ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.00 LPA
We are currently looking for Shift incharge electrical rolling mill for well reputed stee plant at raipur location.
Knowledge of DC Drives both Analog& Digital Drives.
Knowledge of Furnace instruments.
Knowledge of Electrical Equipments.
Knowledge of Electrical Drawing.
Working experience with SAP R/3 for procurement of material,
Collecting all maintenance data, Major Job carried out in ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
1. Key SLD, Protection & Metering SLD
2. Design Basis Reports
3. Sizing calculations / Equipment selection
4. System studies using ETAP
5. Protection, Synchronisation, Control & Metering scheme drawings of Generators, Transformers, Switchgear, Switchyard, Reactors and Lines
6. Networking architecture including IEC61850
7. Relay setting calculation and Parameterisation
8. Control interfaces with DDCMIS, EDMS, ECP
9. Cable ...