1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
10.00 LPA TO 12.00 LPA
Skills : Electrical Manager,Assistant electrical engineer,electrical engineer, Electrical Maintenance,power plant,Electricals engineer, PlantDescription :- Minimum 8 to 12 years of experience in Plant as Electrical Engineer/Manager.- Execute the plan of Operation & Maintenance and focus on energy conservation & Safety.- Implementation of the plan for PM of critical equipment arrange resources ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 5.00 LPA
Should have min. 5 years work experience in a GASIFRE plant / factory including as Gasifire operator Should be well versed with PGP process,Manage and Handle Overall Daily Operation of the Plant.Raw Material to Final Finishing of Product Will Be Done Under His Monitoring.Responsible for Improving and Maintaining Quantity and ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress.
Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Candidate must have sound knowledge of CFBC Boiler DCS operation with 3 – 4 years of experience for B. Tech Holders or 5 – 8 years for Diploma Holders.
Preference will be given to the candidate having experience of Thermax make IRCFBC Boiler.
Urgent requirement of Boiler DCS Engineer/Operator for 2*35 MW ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
40.00 LPA TO 50.00 LPA
We are currently looking for HEAD/VP - ROLLING MILL in EXPERIENCE OVER ALL for well reputed steel plant at West Bengal location
12TN, 15TN, 20TN furnace) for Reputed Steel plant.
Responsible for the day to day operations management of rolling mill & induction furnace
Minimum Working Experience in 12TN, 15TN, 20TN furnace & minimum 10 ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 12.00 LPA
Reporting to the Project Director, the DRI Project Manager, will handle overall execution and management responsibilities related to the engineering, design, construction, commissioning and startup of a Combined Cycle Power facility. The Power Plant Project Manager will manage the FEED and EPC Contractors to ensure adherence to the EPC Contract, ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 5.00 LPA
Shift Supervisor is a professional who is in charge of overseeing business operations on their shift. They must be able to delegate tasks, resolve problems, and make sure that everything goes smoothly for everyone during a given work shift, including stocking inventory all day long until closing down at night
Shift Supervisor ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible for electrical repair & maintenance. 2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation of Utility machines in his shift. 4.Required ITI passed Electrician with at ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.20 LPA TO 1.80 LPA
Responsibilities
Set daily/weekly/monthly objectives and communicate them to employees
Organize workflow by assigning responsibilities and preparing schedules
Oversee and coach employees
Ensure the safe use of equipment and schedule regular maintenance
Check production output according to specifications
Submit reports on performance and progress
Identify issues in efficiency and suggest improvements
Train new employees on how to safely use machinery and ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
Daily monitoring and control of energy consumption of the entire plant.
To ensure compliance with quality standards and maintain related documents.
To ensure the daily routine documentation and utility operation as well as attend the breakdown.
To ensure the Operation of pre-treatment of the water system.
To ensure the effluent treated plant operation, adherence ...