1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
9.00 LPA TO 10.00 LPA
Candidate should have min. 10-12 years of relevant post qualification experience of Power Based combined cycle co-generation
powerplant
& utility. He must have experience of Maintenance and trouble shooting in Gas Turbine , Process Steam Boiler/ Turbine & HRSG operation of 39MW and above capacity of each unit and, Cooling tower and auxiliaries.He ...
6 Opening(s)
4.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
A Raw Material Handling System (RMHS) or Raw Material Processing (RMP) Operator in a steel pipe manufacturing company is responsible for the receiving, storage, preparation, and feeding of raw materials (such as iron ore, coal, lime, or steel scrap) into the production process (DRI kiln, blast furnace, or melting shop).
Key ...
4 Opening(s)
8.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.60 LPA
A 1st Class Boiler Operator in a steel manufacturing company safely operates, monitors, and maintains high-pressure boilers, HRSG (Heat Recovery Steam Generation) systems, and auxiliary equipment to ensure continuous steam production. Key responsibilities include controlling boiler pressure, water treatment, fuel handling, and performing preventative maintenance while adhering to strict safety protocols.
Key ...